68
The Subnet Management
General
tab appears.
3. Click into the
Master Poll Interval
field to change the interval (in seconds) at which the master
SM polls an active slave SM to verify synchronization.
4. Click into the
Master Poll Retries
field to specify the number of unanswered polls that cause the
slave to identify the master as dead.
5. Click into the
Max active SMs
field to specify the maximum number of standby SMs that the
master supports. Backup SMs are not considered “active.” To set a maximum number of backup
SMs, refer to
“Set Configurations for the Backup SM” on page 68
.
6. Click the
Apply
button to save changes.
Set Configurations for the Backup SM
1. Select
InfiniBand
>
Subnet Management
.
The Subnet Management window appears.
2. Highlight the subnet manager that you want to configure from the left-navigation bar.
The Subnet Management
General
tab appears.
Summary of Contents for 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch
Page 10: ...viii ...
Page 20: ...8 ...
Page 44: ...32 ...
Page 50: ...38 ...
Page 56: ...44 ...
Page 72: ...60 ...
Page 92: ...80 ...
Page 104: ...92 ...
Page 116: ...104 ...
Page 122: ...110 ...
Page 130: ...118 ...