To prepare the function generator for use
The following steps help you verify that the function generator is
ready for use.
1 Check the list of supplied items.
Verify that you have received the following items with your function
generator. If anything is missing, contact your nearest Hewlett-Packard
Sales Office.
One power cord.
This
User’s Guide
.
One
Service Guide
.
One folded
Quick Reference
card.
Certificate of Calibration.
2 Connect the power cord and turn on the function generator.
The front-panel display will light up while the function generator
performs its power-on self-test. The
HP-IB
bus address is displayed.
Notice that the function generator powers up in the
sine wave
function
at 1 kHz with an amplitude of 100 mV peak-to-peak (into a 50
Ω
termination).
To review the power-on display with all annunciators turned on,
hold down
Shift
as you turn on the function generator.
3 Perform a
complete
self test.
The
complete
self-test performs a more extensive series of tests than
those performed at power-on. Hold down
Shift
as you press the Power
switch to turn on the function generator;
hold down the key for more
than 5 seconds
. The self-test will begin when you release the key.
If the self-test is successful, “
PASS
” is displayed on the front panel.
If the self-test is not successful, “
FAIL
” is displayed and the
ERROR
annunciator turns on. See the
Service Guide
for instructions on
returning the function generator to Hewlett-Packard for service.
1
Chapter 1 Quick Start
To prepare the function generator for use
15
Summary of Contents for 33120A
Page 6: ...1 Quick Start 1 ...
Page 20: ...2 Front Panel Menu Operation 2 ...
Page 44: ...3 Features and Functions 3 ...
Page 115: ...8 Specifications 8 ...