![horsch Pronto 6 AS Operating Instructions Manual Download Page 74](http://html1.mh-extra.com/html/horsch/pronto-6-as/pronto-6-as_operating-instructions-manual_2164110074.webp)
68
Packer / wheels / brakes
Packer wheels
Check condition, fastening and air pressure
Wheel 750-16
(4.0 bar)
x
Packer shaft
Check condition, fastening and smooth running
x
Brake
Function - check braking effect
x
Air reservoir
Drain
x
Brake lines and hoses
Check for damage, squashing and kinks
x
Brake pads
Check condition, setting and state of wear
x
Brake fluid
Check filling level and leak tightness of containers and lines,
replace the fluid DOT 4 every 2 years.
x
Parking brake
Check function and setting
x
Machine
Road lighting equipment and warning
plates
Check condition and function
x
Warning and safety labels
Check that they are in place and legible
x
at the end of the season
Complete machine
Carry out servicing and cleaning work.
Spray with oil (cover rubber elements)
Coulter disc friction ring bearings
Spray bearing with penetrating oil, e.g. WD 40
Piston rods on hydraulic cylinders
Use penetrating oil or other means to protect piston rods against corrosion
Terminal
store in a dry place
After 3 - 5 years
Hydraulic hoses, lifting hydraulics
replace by following the machine directives
Overview of lubrication points Pronto 6 AS
Lubrication points
Number of Interval
Drawbar on two-point swivel joint
2
daily
Articulated drawbar - hydraulic
2
50 hours
Ball socket in case of ball head hitching
1
daily
Folding frame bolts
4
50 hours
Folding cylinder bolts
4
50 hours
Upper link
1
daily
Lift shaft and lift cylinder
4
daily
Packer roller
8
daily
Bout marker bolt
2
daily
Bout marker disc
2
50 hours
Wind cylinders on drill
2
50 hours
Wind bearings on drill
2
50 hours
Optional equipment
Front packer
2/6
50 hours
Solid fertiliser facility
40
50 hours
Filling auger
1
50 hours
Brake shaft
6
50 hours