
E-13
7. MAINTENANCE
7.1. Daily
maintenance
7.1.1. Replenishing filming liquid
Fill the measuring unit with filming liquid while checking the liquid level through the liquid
level window.
⇒
6.1.4
7.1.2. Replacement of filming liquid
If the filming liquid is contaminated or it has difficulty in creating .liquid films, replace the
filming liquid promptly. Tilt the measuring unit side way to drain the filming liquid.
⇒
6.1.4
7.1.3. Cleaning
measuring
tube
If the measuring tube is contaminated, follow the procedure below to clean it.
①
Drain the filming liquid from the gas inlet.
②
Connect a piece of vinyl tube, longer than measuring unit height, to the gas inlet
port.
③
Raise the end of a vinyl tube, and pour in clean water until the water reaches the
stop detector. In case inside the measuring tube is too dirty, use a neutral detergent
④
Leave for a while. Drain the detergent in the same manner as draining the filming
liquid.
⑤
Rinse the measuring tube thoroughly with clean water.
⑥
Remove the vinyl tube. Fill the equipment with filming liquid after drying inside the
measuring tube.
⇒
6.1.4
7.2. Periodical
maintenance
Periodical maintenance, accuracy inspection and re-calibration are available with an extra
cost so that your SF-1/SF-2 operates correctly and accurately. It is recommended that the
volume value and atmospheric pressure value should be inspected every year.
Consult HORIBA STEC,CO.,LTD. or your dealer for quotation and other details.
7.2.1. Parts
replacement
frequencies
When to replace certain parts depends on the operating frequencies and measurement fluids.
The following parts replacement schedule and frequencies are recommended as a guideline.
Pulse motor assembly
2 years
Filming unit assembly
2 years
Seal kit
2 years or when disassembled
Internal
piping
3
years
Other parts
As required
7.2.2. Maintenance parts list
Filming
liquid
Snoop
®
236ml
No.S000025
(
3024000025
)
Dedicated AC adapter set
PS-SF-100C(for Japan)
No.S242802
(
3200496396
)
Dedicated AC adapter
(for Europe)
Please consult to our company at the time of a necessity.
Dedicated AC power cord
(for Europe)
Please consult to our company at the time of a necessity.
Summary of Contents for SF-1U
Page 1: ...FILM FLOW METER SF 1U 2U Instruction Manual CODE I030248700E...
Page 2: ...May 2016 2004 2016 HORIBA STEC Co Ltd...
Page 3: ...J i...
Page 4: ...J ii...
Page 5: ...J iii 1 2 3 4 5 6 7 8 1 40 2 3 4 5 40 6 7 8 9 10 11 12 13...
Page 7: ...J 1 SF 1U SF 2U Snoop Swagelok Company...
Page 8: ...J 2 1 SF VP 1384428 SF 2U 2 0 35 1013 3hPa 1 3 SF 1U SF 2U 1 Snoop 59ml 1 I030248700 1 AC...
Page 10: ...J 4 5 2...
Page 12: ...J 6 6 6 1 6 1 1 6 1 2 AC...
Page 13: ...J 7 6 1 3 VP 1U 4U SF 3 4 6 1 4 2 3cm 4cm Snoop Snoop...
Page 14: ...J 8 6 1 5 VP 1U 3U 6mm 5 6mm VP 4U 10mm 9 10mm 10mm 9 10mm 3L min 2cm VP 1U 2U 1 2mm...
Page 15: ...J 9 6 1 6 25 5 0 35 25 3 6 1 7 3 10 6 2 6 2 1 N2 5 20 1 1...
Page 16: ...J 10 6 2 2 SF 1U 730 1070hPa 1013 3hPa SF 2U 2 730 1070hPa 1013 3hPa 2 6 2 3 2...
Page 19: ...J 13 8 8 1...
Page 20: ...J 14 8 2 A1 A1 A1 120 VP 1U 180 120 180 6 4 120 120 6 4 A1 7 1 3...
Page 21: ...J 15 8 3 A2 A2 A2 120 VP 1U 180 120 180 6 4 7 1 3...
Page 22: ...J 16 8 4 A3 A3 A3 7 1 3 8 5 A4 A4 A4...
Page 23: ...J 17 8 6 8 7 7 1 3...
Page 39: ...E 4 5 Description of each part Fig 2 Description of each part...