ACM 150
61
Operation
Safe and proper operation of the ACM 150 monitor
ACM 150 operating safety
The ACM 150 monitor design enusres that the operator is protected from injury when
using the front panel touchscreen, keyboard and push buttons. There is no danger to
the operator when opening any of the doors or the outside panels on the ACM 150
monitor for inspection purposes. No internal plates, shields or components should
be touched, tested, removed or serviced except by a Trained Technician. The user
must read and follow all warning labels on the monitor and the highlighted CAUTION,
WARNING and DANGER notes contained in this manual. The ACM 150 monitor is
designed to comply with CE safety standards.
CAUTION!
Do not usee RF-generating devices such as two-way radios or cellular phones
within 10 M of the installed ACM 150 monitor.
MISE EN GARDE!
Avez dispositifs RF générant pas usée tels que les radios bidirectionnelles ou les
téléphones cellulaires moins de 10 m de l' installée ACM 150 moniteur.
Laser and exterior label
Within the FTIR optics bench is a Class 1 laser. A laser-product label is displayed on
the exterior door of the optics cabinet of the ACM 150 monitor.
Laser and interior labels
The front door of the Optics Cabinet may be opened without any danger of a
direct exposure to the laser. The laser is installed inside the Perkin Elmer FTIR
optics bench, and the laser light is contained within it. In the ACM 150 monitor
configuration, the laser light does not exit from any aperture, and there is no danger
of exposure to this laser radiation. Exposure to radiation from this laser is only
possible under these conditions:
•
The FTIR optics bench is physically removed from the ACM 150 monitor Optics
Cabinet,
•
The gas celll is removed while power is applied to the bench, and
•
The bench is disassembled when power is applied.
Summary of Contents for ACM 150
Page 1: ...ACM 150 Air Composition Monitor Guide to Installation Operation and Maintenance ...
Page 2: ......
Page 15: ...ACM 150 15 Figure 1 ACM 150 outside labels ...
Page 16: ...ACM 150 16 Figure 2 ACM 150 inside labels ...
Page 29: ...ACM 150 29 Figure 15 Relay output board ...
Page 59: ...ACM 150 59 Figure 30 Installation diagram ...
Page 152: ...ACM 150 152 ...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...ACM 150 Air Composition Monitor Revision 2 ECO HAA150063 December 2015 Honeywell Analytics ...