ACM 150
104
Inspection and service schedule
The ACM 150 monitor constantly monitors itself for proper operation. Problems
are identified as Service Events and they change Service Status. At the same time,
relays are activated to notify the user of service problems or a loss of power (refer
to
Troubleshooting
). All users should utilize these relay outputs for immediate
notification that a service problem has been detec- ted.
Monthly service
It is highly recommended to reboot the ACM 150 monitor computer monthly. This
ensures proper operation and avoids unexpected behaviour.
Quarterly inspection
It is recommended that the ACM 150 monitor be inspected every 3 months (more
frequently, if desired) and that service be performed, if any problems or failures are
found.
A qualified service technician must be contacted and resolve them following
Service
inspections and procedures
.
Summary of Contents for ACM 150
Page 1: ...ACM 150 Air Composition Monitor Guide to Installation Operation and Maintenance ...
Page 2: ......
Page 15: ...ACM 150 15 Figure 1 ACM 150 outside labels ...
Page 16: ...ACM 150 16 Figure 2 ACM 150 inside labels ...
Page 29: ...ACM 150 29 Figure 15 Relay output board ...
Page 59: ...ACM 150 59 Figure 30 Installation diagram ...
Page 152: ...ACM 150 152 ...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...ACM 150 Air Composition Monitor Revision 2 ECO HAA150063 December 2015 Honeywell Analytics ...