ACM 150
105
Annual PM services
Inspect and service the ACM 150 monitor in accordance with
Service inspections
and procedures
. If you have not already done so during the course of the past 12
months, replace these expendable items:
•
Cabinet filters
•
Gas cell filter
•
In-line filters
•
Gas cell windows
•
Booster pump diaphragm / flapper valves
•
Back-up pump vanes
(but only if the venturi pumps were not in use most of the time)
•
FTIR Desiccant
If any of these items have been replaced during the past 12 months and pass
inspection, there is no need to replace them during the annual service.
Three year service
These services are recommended at least once every 3 years:
FTIR Optics Bench: The infrared source, HeNe laser and laser power supply have a
limited operating life. HA can provide a reconditioned bench to exchange for your
used bench, which is returned to HA for reconditioning.
Five year service
These services are recommended at least once every 5 years:
Sample Valves: Disassemble the valve manifolds and clean the valves with a solvent
to assure that the accumulation of deposits and particles are removed.
Cycle Valves: These valves are expected to eventually wear out. They can be
replaced as one subassembly.
Summary of Contents for ACM 150
Page 1: ...ACM 150 Air Composition Monitor Guide to Installation Operation and Maintenance ...
Page 2: ......
Page 15: ...ACM 150 15 Figure 1 ACM 150 outside labels ...
Page 16: ...ACM 150 16 Figure 2 ACM 150 inside labels ...
Page 29: ...ACM 150 29 Figure 15 Relay output board ...
Page 59: ...ACM 150 59 Figure 30 Installation diagram ...
Page 152: ...ACM 150 152 ...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...ACM 150 Air Composition Monitor Revision 2 ECO HAA150063 December 2015 Honeywell Analytics ...