5-5
dummyhead
dummyhead
COVER
Parts
Remarks
[1] BOLT (5 x 12 mm) (2)
[2] CONNECTOR STAY
INSTALLATION: Align the groove with the lug (page 2-4).
[3] POWER CABLE
INSTALLATION: Align the four holes with the pins of the tray (page 2-4).
[4] CLIP BAND
[5] BOLT (8 x 16 mm) (2)
[6] BOLT (8 x 20 mm) (2)
[7] BATTERY HOOK
INSPECTION: page 5-6
[8] BATTERY TRAY
[9] E-RING
[10] LOCK LEVER PIN
[11] FASTENER LEVER
[12] SOCKET BOLT (6 x 12 mm)
[13] FASTENER WIRE
INSPECTION: page 5-6
[14] SOCKET BOLT (6 x 12 mm)
[15] HARNESS CLIP BRACKET
[16] BATTERY MOUNT RUBBER (4)
INSPECTION: page 5-6
[17] HOLE CAP (2)
[18] NUT (6 mm) (8)
[19] BATTERY FRAME
[20] FRAME MOUNT RUBBER (4)
INSPECTION: Check for cracks or other damage.
INSTALLATION: Align each two locating pins with the holes in the frames.
[21] STOPPER RUBBER
INSPECTION: Check for wear or deterioration.
INSTALLATION: Fit the rubber flanges over the sleeve edge of the frame securely.
Summary of Contents for GXE2.0H
Page 8: ...MEMO dummyhead dummyhead ...
Page 22: ...MEMO dummyhead dummyhead ...
Page 27: ...4 1 4 dummytext 4 TROUBLESHOOTING TROUBLESHOOTING INFORMATION 4 2 DTC TROUBLESHOOTING 4 6 ...
Page 42: ...MEMO dummyhead dummyhead ...
Page 54: ...6 6 dummyhead dummyhead CONTROL UNIT STAYS MOUNT RUBBERS 5 6 3 5 2 9 7 1 3 2 8 1 4 3 3 3 ...
Page 58: ...MEMO dummyhead dummyhead ...
Page 67: ...8 1 8 dummytext 8 WIRING DIAGRAMS WIRING DIAGRAMS 8 2 ...
Page 70: ...MEMO dummyhead dummyhead ...