6-7
dummyhead
dummyhead
CONTROL UNIT
MOUNT STAY CLEARANCE CHECK
Remove the battery tray (page 5-4).
Measure the clearance between the PDU stay A [1] and C [2] at the points
“a” without force.
It should be within 4.6 – 8.0 mm (0.18 – 0.31 in).
The clearance cannot be adjusted.
If it is not within specification, check each installation part for deformation,
looseness, or damage.
Parts
Remarks
[1] STOPPER PIN BOLT (2)
INSPECTION: Check for wear or other damage.
[2] NUT (6 mm) (4)
[3] PDU STAY C
REMOVAL/INSTALLATION: Release the lower side by sliding it and then the upper
side in sequence as shown to avoid damaging the mount rubbers (Installation is in the
reverse order).
[4] NUT (6 mm) (4)
[5] MOUNT RUBBER (4)
INSPECTION: Check for cracks or other damage.
INSTALLATION: Align the two locating pins with the slot in the PDU stay C.
[6] BOLT (6 x 16 mm) (4)
[7] BRACKET STAY
INSTALLATION: Face the weld nuts to the opposite side of the PDU.
[8] PDU STAY A
[9] PDU STAY B
[1]
[2]
a
a
Summary of Contents for GXE2.0H
Page 8: ...MEMO dummyhead dummyhead ...
Page 22: ...MEMO dummyhead dummyhead ...
Page 27: ...4 1 4 dummytext 4 TROUBLESHOOTING TROUBLESHOOTING INFORMATION 4 2 DTC TROUBLESHOOTING 4 6 ...
Page 42: ...MEMO dummyhead dummyhead ...
Page 54: ...6 6 dummyhead dummyhead CONTROL UNIT STAYS MOUNT RUBBERS 5 6 3 5 2 9 7 1 3 2 8 1 4 3 3 3 ...
Page 58: ...MEMO dummyhead dummyhead ...
Page 67: ...8 1 8 dummytext 8 WIRING DIAGRAMS WIRING DIAGRAMS 8 2 ...
Page 70: ...MEMO dummyhead dummyhead ...