Summary of Contents for KSD Series

Page 1: ...SEVA tec GmbH Lether Gerwerbestrasse 10 26197 Ahlhorn www seva tec de ...

Page 2: ...ation and assembly 5 5 Electrical connection 6 5 1 General information 6 5 2 Connection of lead out cables 7 6 Commissioning 7 6 1 General information 7 6 2 Tightening torques 8 7 Maintenance 9 7 1 Initial inspection 10 7 2 Main inspection 10 7 3 Lubrication 11 12 8 Auxiliary equipment 13 8 1 Thermal protection 13 8 2 Electromagnetic compatibility 13 9 Troubleshooting 14 10 Construction of motors ...

Page 3: ...ructed and authorised personnel VDE 0105 please observe IEC 364 1 3 Basic safety rules The safety risks posed by the motor must be reassessed after installing it into the end device The local occupational safety regulations must be observed during the usage of the motor The operation place must be kept clean and tidy 1 4 Electric Voltage Regularly check the electrical equipment of the motor Immedi...

Page 4: ...ufficient contact protection to avoid burn risks DANGER Surface temperatures 1 7 Noise emission Take protection measures and secure the personnel with appropriate equipment such as hearing protection DANGER Sound pressure level 2 Proper use The motors are only approved by SEVA tec GmbH for being used for purposes specified in the catalog and related technical documentation Any other usage beyond t...

Page 5: ...riable speed drive The regulation hereby allows the user to use either an IE3 motor for fixed or variable speed or an IE2 motor in conjunction with a speed controller The user is responsible for compliance with the requirements of the EU regulation 3 Transport und storage Keep the motors safe against mechanical damage and only in closed dry rooms In case of short term storage in an open air area t...

Page 6: ...tection IPX6 IP6X are sealed in a water or dust tight manner after the condensate has been drained as well as during transport and storage For the IM B14 and IM B34 mounting motors the maximum screw in depths specified in the table 1 must be observed If an IM B14 and IM B34 mounting motor is used stored or transported without flanged equipment the user must take appropriate precautions against the...

Page 7: ... leads are colour coded the assignment of the colour is glued on the cover plate For the motor version with terminal box each individual wire is labeled The user connects the lead out cables in the control cabinet accordingly 6 Commissioning 6 1 General information The installation must be carried out in a power supply free state in accordance with applicable regulations by appropriately trained p...

Page 8: ...orques for screws of the end shields bearing caps and terminal box Frame size Arrangement End shield Bearing cap Terminal box cap Terminal box Thread Tightening torque Nm 56 B3 B5 B14 M4 2 0 Nm M4 1 0 Nm M4 2 0 Nm 63 M5 1 5 Nm M5 3 0 Nm 71 80 M6 7 0 Nm 90 M5 2 5 Nm M5 4 0 Nm 100 M8 17 Nm 112 132 160 M6 7 Nm M6 3 0 Nm M6 4 5 Nm 180 M10 34 Nm M8 17 Nm 200 M12 60 Nm M8 4 0 Nm M8 7 0 Nm 225 M10 34 Nm ...

Page 9: ...h without renewal of the rolling bearing grease under normal load conditions and under normal environment conditions The condition of grease should however be controlled even during this period The specified life expectancy of bearings applies only for operation with nominal speed and bearing operating temperature of 80 C ambient temperature 20 C When operating with inverter or increased ambient t...

Page 10: ...test determines whether the cables and the insulating materials are in a proper condition They must not display discoloration or any burn marks and must not be cracked or otherwise damaged Check the insulation resistance Depending on the quality of grease local ambient conditions and the duty the change of the rolling bearings and the oil seals may be necessary after 10 000 h but at least annually...

Page 11: ... NU317 6314 4000 45 45 SEV 280M4 4 6317 NU317 6314 4000 45 45 SEV 225M4 4 6313 NU313 6312 5000 32 32 SEV 250M4 4 6314 NU314 6313 4500 45 45 SEV 200L4 4 6312 NU312 6212 5000 32 32 SEV 225S4 4 6313 NU313 6312 5000 32 32 SEV 180M4 4 6311 6211 SEV 180L4 4 6311 6211 SEV 160M4 4 6309 6209 SEV 160L4 4 6309 6209 SEV 355L 2 2 6319 NU319 6319 1000 80 80 SEV 315Lx 2 2 6317 NU317 6317 1000 65 65 SEV 355M2 2 6...

Page 12: ...5M 8 8 6319 NU319 6319 5800 65 65 SEV 315L1 8 8 6319 NU319 6319 5800 65 65 SEV 280M 8 8 6317 NU317 6314 6000 45 45 SEV 315S 8 8 6319 NU319 6319 5800 65 65 SEV 250M 8 8 6314 NU314 6313 6300 45 45 SEV 280S 8 8 6317 NU317 6314 6000 45 45 SEV 225S 8 8 6313 NU313 6312 6500 32 32 SEV 225M 8 8 6313 NU313 6312 6500 32 32 SEV 180L 8 8 6311 6211 SEV 200L 8 8 6312 NU312 6212 6500 32 32 SEV 160M2 8 8 6309 620...

Page 13: ...st continuous service temperature 30 120 C 30 140 C 30 120 C 30 140 C 30 120 C 30 140 C 30 120 C 30 140 C Table 8 Selection of the re lubrication grease SEVA tec GmbH Lether Gerwerbestrasse 10 26197 Ahlhorn www seva tec de 13 Table 8 displays a grease specification and is only valid for ambient temperatures of 30 C to 60 C bearing temperature up to 110 C and operation with the rated speed When ope...

Page 14: ...shaft Wrong belt drive Reduce belt tension arrange pulley closer to the bearing Wrong allignment Allign the machinery Inadequate excess grease Note the amount of re grease Table 9 Troubleshooting SEVA tec GmbH Lether Gerwerbestrasse 10 26197 Ahlhorn www seva tec de 14 Failure Cause Actions The machinery doesn t start Overload Reduce the load Wrong stator connection Check the connection Fault power...

Page 15: ...e X X 20 Schraube für Lagerschild bzw Flansch Screw for end shield flange X X 21 Schraube für Klemmenkasten Screw for terminal box X X 22 Schraube für Klemmenbrett Screw for terminal board X X 23 Schraube für Klemmenkastendeckel Screw for terminal box cover X X 24 Schraube für Lüfterhaube Screw for fan cover X X 25 B5 Flansch Flange IM B5 X X 26 B14 Flansch Flange IM B14 X X 27 Schraube für Anbauf...

Page 16: ...0 6 5 14 22 21 10 29 28 18 16 12 8 19 27 7 10a 1 25 13 20 17 11 15 26 3 4 32 13 2 23 9 20 24 Beschreibung Ersatzteile description of spare parts Aluminiumgehäuse aluminum housing 31 B4 B12 B5 B9 B2 B2 B3 B1 B11 B6 B7 B10 B8 B12 16 SEVA tec GmbH Lether Gerwerbestrasse 10 26197 Ahlhorn www seva tec de ...

Page 17: ...ation X X 19 Dichtung für Klemmenkasten Gasket for terminal box X X 20 Klemmenbrett Terminal board X X 21 Schraube für Klemmenbrett Screw for terminal board X X 22 Klemmenkasten Terminal box X 23 Dichtung für Klemmenkastendeckel Gasket for terminal box cover X 24 Klemmenkastendeckel terminal box cover X 25 Schraube für Klemmenkastendeckel Screw for terminal box cover X X 26 Schraube für Klemmenkas...

Page 18: ...ssgehäuse Cast iron housing Beschreibung Ersatzteile description of spare parts 23 24 22 31 30 27 28 29 18 13 9 14 15 5 4 11 21 20 19 10a 10 31 8 1 5 4a 2 12a 16 25 26 7 2 31 3 17 6 1a B1 B2 B8 B6 B2a B7 B11 B10 B5 B9 B3 B4 B12 B1 B12 SEVA tec GmbH Lether Gerwerbestrasse 10 26197 Ahlhorn www seva tec de 18 ...

Page 19: ...0 2 0 4 0 6 0 8 1 0 10 0 2 0 3 70 0 8 90 100 1 1 0 9 0 7 0 5 0 3 0 1 Size Load capacity curve of SEVA tec electric motors in frequency inverter operation without forced cooling fan Nominal torque in 40 50 0 6 Frequency in Hertz 200 315 63 180 19 11 Load capacity curve Size ...

Page 20: ...n requirements for energy related products Official Journal of the European Union L285 31 10 2009 S 10 35 The sole responsibility for issuing this Declaration of Conformity lies with the manufacturers Compliance with the provisions of these Directives is demonstrated by compliance with the following standards Reference number and issue date EN 61000 6 2 2005 Cor 2005 EN 61000 6 4 2007 A1 2011 EN 6...

Reviews: