[19]
□
Step 8: L60A & L80B
– 16 turns (17 in/43.2cm) of #20 enameled wire on a T80-2 (red) toroid core. Wind
the inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.
Two of these coils are required L60A and L80B as shown
□
Step 9: L60B
– 15 turns (16 in/40.6cm) of #20 enameled wire on a T80-2 (red) toroid core. Wind the
inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.