
- 21 -
⑥.
Operational check
After checking and adjusting each component, do an operational check with screws loaded.
If any abnormality is found, make the said adjustments once again in addition to the rail vibration and front/rear position
adjustments.
After completing the operational check, return the wiring arrangement to its original status.
When installing the cover, take care not to catch or pinch the wires.
Watch that the wiring does not hinder the operation of this machine.