Preliminary Steps
6.1 Installing guards
▶
Install both guards, using the screws provided for the purpose.
The installation procedure is described on the enclosed leaflet.
6.2 Determining length of wire
▶
You can calculate the approximate length of wire needed as follows:
▶
Minimum length of wire inside the machine of 5.6 meters.
▶
+ distance from the outfeed pulley to the diamond wire's point of engagement in
the object to be cut
▶
+ 2 x thickness of object to be cut
▶
+ cutting length
▶
+ wire length from the point of exit from the object to be cut to the infeed pulley of
the wire saw
6.3 Safety aspects to be clarified before work starts
• Is the cutting area free from hazardous pipes or cables (gas, water, electricity, etc.)?
• Have the effects of the cutting work on the stability of the structure been clarified and
are all supports capable of taking up the resulting loads?
• Can the possibility of hazards or damage as a result of the cooling water used be ruled
out?
• Can the work zone be secured to such an extent that persons cannot be injured or
property damaged by falling or flying parts?
• Can the parts of the structure cut away be removed safely in a controlled operation
and disposed of?
• Do the electricity supply and the water supply available for use meet the specified
requirements?
• Has the work to be carried out been approved in full by site management?
6.4 Marking line of cut
The parts to be cut out are usually marked by the client. If necessary, make dividing cuts
to adjust the maximum size and weight of the concrete blocks to the prevailing conditions
(i.e. the lifting capacity of the crane or the maximum permissible floor loading capacity
and size of doors).
Summary of Contents for DSW 2005-TS
Page 1: ...DSW 2005 TS English...
Page 2: ......
Page 3: ...DSW 2005 TS Original operating instructions...
Page 4: ......
Page 43: ...2235115 2235115 English 39...
Page 44: ...Hilti registered trademark of Hilti Corp Schaan 20200303 2235115 2235115...