![Hewlett Packard Enterprise HPE ProLiant DL580 Gen10 User Manual Download Page 115](http://html1.mh-extra.com/html/hewlett-packard-enterprise/hpe-proliant-dl580-gen10/hpe-proliant-dl580-gen10_user-manual_2128065115.webp)
15. Connect each power cord to the power source.
Deploying an operating system
17. Deploy a supported operating system to the boot device drive.
For more information, see the product QuickSpecs (
After the OS installation completes, the system automatically copies the operating system to the second, mirrored
drive on the boot device.
18. Proceed with normal system setup and operation.
Installing the Pensando DSP DSC-25 2p SFP28 card
The DSC-25 card can be installed in any available PCIe expansion slot in the server.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1.
Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or
other static-sensitive devices. To prevent damage, observe antistatic precautions.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCI slots
have either an expansion slot cover or an expansion board installed.
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Do one of the following:
• Extend the server from the rack (
Extending the server from the rack).
• Remove the server from the rack (
Removing the server from the rack).
5.
Remove the access panel (
Hardware options installation
115