en
12.2020 / Rev. 02
AB66005
28 / 174
Commissioning
2
1
Fig. 15: Front wooden beam
1 Fastening screws
2 Front wooden beam
1
2
3
Fig. 16: Fastening metal rails
1 Metal rails
2 Nails
3 Wooden pallet
1
2
Fig. 17: Wooden beam under the metal
rails
1 Metal rails
2 Front wooden beam
1
1
Fig. 18: Screwing in levelling elements
1 Device feet
1.
Remove the two fastening screws and remove the front
wooden beam.
In the case of devices with the optional glass
door, there are additional reinforcements
attached to the wooden beam. These can be
removed with the beam.
2.
Fasten the two metal rails to the wooden pallet with two nails
each.
3.
Push the front wooden beam under the metal rails to support
these.
The angle between the metal rails and the floor
must not be more than 6°.
4.
Screw the front levelling elements completely into the device
feet (upward).
NOTICE
The levelling elements have a height of 60 mm
when screwed-in. Hereby, the inner part proj-
ects 3 mm with respect to the outer part.
The rear levelling elements are already screwed
in ex works.
Summary of Contents for HettCube 200
Page 151: ...151 174 en 12 2020 Rev 02 AB66005 Index W Warning symbols 7 Warnings and error messages 126 ...
Page 152: ...en 12 2020 Rev 02 AB66005 152 174 Index ...
Page 153: ...13 Appendix ...
Page 154: ......
Page 166: ...en 12 2020 Rev 02 AB66005 166 174 Examples ...
Page 170: ...en 12 2020 Rev 02 AB66005 170 174 Accessory overview ...
Page 171: ...171 174 en 12 2020 Rev 02 AB66005 Declaration of conformity D Declaration of conformity ...