43
SECTION 15 i.
DECAY LEAK TEST CONT.
-0.0
Live( PSi)
0
8.7
Decay( PSi)
Press Zero to re-run
Modes
Dual mode functions...
Percent error...
Switch testing...
Decay leak test
Leak Test Period
+060.0
sec
Enter to run test
Esc to cancel
Leak Test Period
+120.0
^
sec
Enter to run test
Esc to cancel
Press ENTER
Press DOWN or UP arrow to highlight desired leak test time
period or “Custom”
If 30 or 60 seconds is selected, press ENTER to immediately
begin test. Skip to when test is complete
If CUSTOM is selected
Press RIGHT or LEFT arrow to select which character to
change.
Press DOWN or UP arrow to scroll through numeric values
until desired number of seconds is displayed.
Press ENTER to immediately begin Leak Decay Test.
When test is complete the decay value will be displayed in the
unit of measure selected previously. Pressure decrease will
display as a positive value, pressure increase will display as a
negative value.
Summary of Contents for PTE-2
Page 2: ...ii...
Page 52: ...50 SECTION 15 l FIRMWARE UPDATE CONT...
Page 53: ...51 SECTION 15 l FIRMWARE UPDATE CONT...
Page 57: ...55 SECTION 15 l FIRMWARE UPDATE CONT Note The File Transfer can take up to 15 Minutes...
Page 86: ...84 NOTES...
Page 87: ...85...