20
Heatilator • ECLIPSE-32, ECLIPSE-36 Installation Manual • 2297-984 Rev. B • 6/15
Figure 4.14
Top Vent - Vertical Termination
- (continued)
Three Elbows
Figure 4.13
Two Elbows
Note: Use SLP Series
components only.
V
1
Minimum
H
1
Maximum
90 Elbow Only
1-1/2 ft. 457 mm
1/2 ft.
152 mm
2 ft.
610 mm
1-1/2 ft. 457 mm
3 ft.
914 mm
2-1/2 ft. 762 mm
5 ft.
1.5 m
3-1/2 ft.
1.1 m
7 ft.
2.1 m
4-1/2 ft.
1.4 m
15 ft.
4.6 m
H
1
MAX. =15 ft. (4.6 m)
V
1
+ V
2
+ H
1
MAX. = 40 ft. (12.2 m)
V
1
Minimum
H
1
+ H
2
Maximum
90 Elbow Only
1/2 ft.
152 mm
1/2 ft.
152 mm
1 ft.
305 mm
1-1/2 ft.
457 mm
2 ft.
610 mm
2-1/2 ft.
762 mm
4 ft.
1.2 m
3-1/2 ft.
1.1 m
6 ft.
1.8 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
H
1
+ H
2
MAX. =14 ft. (4.3 m)
V
1
+ V
2
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
Note
: There MUST be a 25% reduction
in total H when using
fl
ex vent except
when using the simple up and out
installation (see Figure 4.6).
Note
: There MUST be a 25% reduction
in total H when using
fl
ex vent except
when using the simple up and out
installation (see Figure 4.6).
Note: Use SLP Series
components only.
H
1
V
1
V
2
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
V
2