53
Heatilator • ECLIPSE-32, ECLIPSE-36 Installation Manual • 2297-984 Rev. B • 6/15
A. Vent Components Diagrams
(continued)
13 in.
(330 mm)
15 in.
(381 mm)
8-1/8 in.
(206 mm)
DVP-HRC-SS NOT APPROVED FOR ALL UNITS.
10-7/8 in.
276 mm
10-1/2 in.
267 mm
3°
87°
Effective Length
5-3/4 to 8-3/8 in.
146 to 213 mm
5-1/2 in.
140 mm
8-3/8 in.
213 mm
DVP-HRC-ZC-SS NOT APPROVED FOR ALL UNITS.
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented
fi
replaces,
a one foot minimum vertical vent section is
required before installing
fi
rst elbow.
WARNING
13 in.
(330 mm)
15 in.
(381 mm)
8-1/8 in.
(206 mm)
10-7/8 in.
276 mm
10-1/2 in.
267 mm
3°
87°
Effective Length
5-3/4 to 8-3/8 in.
146 to 213 mm
5-1/2 in.
140 mm
8-3/8 in.
213 mm
SLP-HRC-SS
SLP-HRC-ZC-SS
HORIZONTAL TERMINATION CAP
• When using DVP-TB1 termination cap on top vented
fi
replaces, a three foot minimum vertical vent section is
required before installing
fi
rst elbow.
DVP-TB1
HORIZONTAL TERMINATION CAP
SLP90
SL-2DVP
DVP-TB1
DVP-TB1
ASSEMBLY
Figure 12.5 Vent Components