17
Heatilator • ECLIPSE-32, ECLIPSE-36 Installation Manual • 2297-984 Rev. B • 6/15
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
Top Vent - Horizontal Termination
- (continued)
Note
: There MUST be a 25% re-
duction in total H when using
fl
ex
vent except when using the sim-
ple up and out installation (see
Figure 4.6).
Figure 4.9
Two Elbows
V
1
Minimum**
H
1
+ H
2
Maximum
90 Elbow Only**
1/2 ft.
152 mm
1/2 ft.**
152 mm
1 ft.
305 mm
1-1/2 ft.** 457 mm
2 ft.
610 mm
2-1/2 ft.** 762 mm
4 ft.
1.2 m
3-1/2 ft.
1.1 m
6 ft.
1.8 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
H
1
+ H
2
MAX. =14 ft. (4.3 m)
V
1
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
**See Warning Below.
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-SS
termination caps on top vented
fi
replaces, a one
foot minimum vertical vent section is required
before installing
fi
rst elbow.
• When using DVP-TB1 termination cap on top
vented
fi
replaces, a three foot minimum vertical
vent section is required before installing
fi
rst
elbow.
WARNING**
Note: Use SLP Series
components only.