49
Heat & Glo • HE36CLX-S • 2183-900 Rev. H • 1/14
G. Refractory
CAUTION! Risk of Cuts or Abrasions.
Wear protective
gloves and safety glasses during installation.
NOTICE: Handle refractory panels with care. Refractory
may chip or crack if dropped or impacted.
KIT COMPONENTS
(1) Left Refractory
(1) Right Refractory
(1) Back Refractory
(1) Top Refractory
(1) Left Refractory Base
(1) Right Refractory Base
(1) Front Refractory Base
INSTALLATION
1. Install back refractory by placing against the back wall
of the
fi
rebox. See Figure 1.
Figure 3. Refractory Tabs
SLOTS
NO GAPS
2. Install left side refractory by placing the left refractory
panel against the side of the
fi
rebox and pushing to-
ward the back of the
fi
rebox until side refractory con-
tacts back refractory panel. See Figure 2. Ensure side
panels contact back panel so that no gaps exist. Fol-
low the same procedure to place the right side refrac-
tory panel.
3. Using both hands, hold the top refractory panel with
the brick pattern facing down and the slots toward the
rear of the
fi
rebox. See Figure 3.
4. Insert the top refractory panel into the
fi
rebox and lift
it toward the top. Keep top refractory panel close to
upper
fi
rebox lip. This will allow for easier installation
due to the wider dimension of the front of the
fi
rebox.
Slide the top refractory panel in toward the back wall
of
fi
rebox, maintaining the same angle as the top sec-
tion of the side panels.
Figure 1. Rear Refractory Installation
Figure 2. Right and Left Refractory Installed