
ARB Approved IOM – Executive Orders VR-201-B and VR-202-B (Wayne Harmony WayneVac Dispenser)
Page 108
Healy Systems, Inc.
Website: http://www.healysystems.com
18 Hampshire Drive
Email: [email protected]
Hudson, New Hampshire 03051 USA
Telephone: 603.882.2472
ARB Approved Installation, Operation and Maintenance Manual (November 2006) Fax: 603.882.5189
Healy Systems, Inc. – the innovative leader of Stage II vapor recovery equipment
Remove the “J” Box cover.
Remove the Door Cladding assembly and the Access Door assembly in order to expose
the electronics compartment.
7. SURVEY– Scope of Work: Perform this step before beginning steps 8 thru 12.
Read and familiarize yourself with the theory of operations sheet and wiring instructions for the
VP1000 Vapor Pump. The installation of the pump is on the sheet metal shelf over the junction
box, with the pump cover facing the “A” side of the dispenser, see photo E. This is the side
that the vapor tubes from the out port of the Wayne-VAC
™
vacuum pumps are connected to a
vapor tee mounted at the base of the dispenser, see photo F. From this survey, you will have
an indication of where the vapor plumbing fittings need to go and where the holes need to be
drilled in the adjoining sheet metal to allow the vapor pipes from the pump to pass through to
the hydraulics compartment. Notice also in the electrical junction box, on the bottom right
side, there is a potted conduit nipple which contains the Wayne-VAC
™
wiring harness (for
pump on “A” side) that you will remove to install the Healy potted conduit nipple, See Section
11. CAUTION: ALL POWER TO DISPENSER UNDER MODIFICATION SHOULD BE COMPLETELY
DISCONNECTED AND CAPPED OFF AT JUNCTION BOX TO AVOID UNINTENTIONAL
FEEDBACK FROM OTHER DISPENSERS!!
Photo
E
Photo
F
8.
WAYNE-VAC
™
REMOVAL:
Disconnect and lockout the power to the dispenser.
Open the dispenser cabinet doors as specified in section 6 above.