Healy VP1000 Installation, Operation And Maintenance Manual Download Page 14

ARB Approved IOM – Executive Orders VR-201-B and VR-202-B (Wayne Harmony WayneVac Dispenser) 

Page 116 

Healy Systems, Inc. 

                                                        Website: http://www.healysystems.com 

18 Hampshire Drive 

                                                                  Email: [email protected] 

Hudson, New Hampshire 03051 USA 

                                                                              Telephone: 603.882.2472 

ARB Approved Installation, Operation and Maintenance Manual (November 2006)                                    Fax: 603.882.5189 

 

 

 

Healy Systems, Inc. – the innovative leader of Stage II vapor recovery equipment

 

 

‰

 

Connect the wires from the sealed nipple to the interface module as follows: 

ƒ

 

Black wire to ‘motor ‘ on module 

ƒ

 

White wire to ‘neutral’ on module 

ƒ

 

Red wire (either) to ‘output 1’ on module 

ƒ

 

Red wire (other) to ‘output 2’ on module 

ƒ

 

Orange wire to ‘fault common’ on module 

ƒ

 

Purple wire to ‘fault input’ on module 

ƒ

 

Green wire needs a #8 ring tong lug installed and connected to any chassis ground 
(frame) 

ƒ

 

Some sealed nipples may have some extra wires, cap these and bundle them 
neatly out of the way. 

‰

 

The black and white twisted pair of wires with a connector should be connected to an 
available AC outlet on the dispenser Relay Board #887225. 

‰

 

The male/female multiconductor cable that is wired to the interface module is routed up 
to the computer board # 173976, see photo T.  Disconnect the valves cable that’s in the 
J3 connector and install in the female side of the double connector on the harness.  The 
entire assembly is then installed back into J3 on the Computer board.  WIRING IS 
COMPLETE. 

‰

 

Mount the interface module as shown in Photo S using the 8-32 x 5/8” screw, washer and 
nut supplied in the electrical kit. 

‰

 

Install the following labels supplied: 

 

NOTICE label for current increase (1405), install on the frame rail near the 
existing power consumption label. 

 

Large NOTICE label (1406) relating to the vapor recovery upgrade and how to 
reset the electronic module should be installed near the module, where it will be 
readily visible to a service technician on the junction box cover. 

 

UL, retrofit kit identification number (1410), install on the electronic module. 

 

13.  CONNECTING HEALY SYSTEMS DISPENSING EQUIPMENT 

‰

 

Completing the connection of Healy Systems dispensing equipment requires the 
installation of Healy Systems Phase II dispenser adaptors, hoses and nozzles 
(Hanging Hardware). 

‰

 

If applicable, remove existing non-Healy hanging hardware (from the dispenser 
product outlet adaptor to and including the nozzles). 

 

 

Summary of Contents for VP1000

Page 1: ...TEM KIT Z080 OUTLINE NOTICE USE THIS PROCEDURE IF CONVERTING A WAYNE VAC VAPOR RECOVERY ASSIST SYSTEM TO A HEALY VAPOR RECOVERY ASSIST SYSTEM See Healy Systems Kit Z078 For Dispensers With Balance Sys...

Page 2: ...electrical and hydraulic plumbing fittings referred to in these instructions must be UL listed or recognized for the purpose 2 SAFETY Before installing the equipment read understand and follow The Nat...

Page 3: ...ation Operation and Maintenance Manual November 2006 Fax 603 882 5189 Healy Systems Inc the innovative leader of Stage II vapor recovery equipment dispenser will increase the current draw of the dispe...

Page 4: ...4 machine screw washer nut 1 1 2 male NPT x 3 4 female NPT electrical reducer fitting 1 1346 potted conduit nipple 1 8 Ring tong terminal 1 Notice label p n 1406 1 UL Listed label p n 1410 VAPOR KIT...

Page 5: ...wide and Phillips 5 8 copper tube bending tool 5 8 copper tube flaring tool Copper tubing cutter Electrical multi meter Small hand brush 1 1 2 thick for clearing chips 12 adjustable wrench 10 pipe wre...

Page 6: ...pump cover facing the A side of the dispenser see photo E This is the side that the vapor tubes from the out port of the Wayne VAC vacuum pumps are connected to a vapor tee mounted at the base of the...

Page 7: ...rn line impact valve If there is no impact valve be sure to have proper plugs or caps available to plug the Stage ll line before disconnecting the Wayne VAC equipment Unscrew the flare nuts holding th...

Page 8: ...arness from the bottom of the potted nipple under the J box to the Wayne VAC electronics control board 887227 remove the 2 connectors from the board and also the green ground wire attached to the chas...

Page 9: ...re down an additional 6 3 4 and mark on the centerline These marks are the centers of the holes for the vapor pipes going to the VP1000 DO NOT DRILL verify positions in the next steps Get the vapor pu...

Page 10: ...oward you Install a 1 2 NPT x 5 8 flare straight fitting to the left side of the ball valve install the 1 2 close nipple to the right side then the 1 2 reducing tee and the 1 2 NPT x 5 8 flare elbow c...

Page 11: ...n install the two 1 4 20 bolts washers lock washers and nuts to secure the pump Photo M Photo N Measure and cut appropriate length of 5 8 tubing to reach from the 5 8 flare elbow on the outlet of the...

Page 12: ...ure there is at least five full threads of engagement of the fittings in their respective couplings Thread the pump wires through the elbow that was removed from the Wayne VAC motor electronics housin...

Page 13: ...THE ELECTRONICS COMPARTMENT See Photos Q R S T Photo Q Photo R In the electronics bay locate the light assembly on the upper right side of the cabinet see photo Q In photo R notice the 3 16 hole that...

Page 14: ...le multiconductor cable that is wired to the interface module is routed up to the computer board 173976 see photo T Disconnect the valves cable that s in the J3 connector and install in the female sid...

Page 15: ...n the highest position Be sure to check for proper fit in the nozzle holster and that the nozzle can be locked in the off position Also be sure that when the nozzle is locked that the dispenser can no...

Page 16: ...s a 0 100 water column gauge Connect the gauge into the 1 4 test port of the reducing tee installed earlier in section 10 Photo L Continue by following and completing the START UP NEW INSTALLATION WAR...

Page 17: ...equipment If diagnosing a problem where the LED is already illuminated a steady light indicates a low current condition therefore expect a vane or rotor problem If the LED is blinking that indicates a...

Page 18: ...racks chips or breaks Replace rotor and vanes if any damage is found PN VP1000VRC 7 If no visible damage is apparent the existing rotor and vanes may be reused after thoroughly cleaning with isopropyl...

Page 19: ...ARB Approved IOM Executive Orders VR 201 B and VR 202 B Wayne Harmony WayneVac Dispenser Page 121...

Page 20: ...ARB Approved IOM Executive Orders VR 201 B and VR 202 B Wayne Harmony WayneVac Dispenser Page 122...

Reviews: