ARB Approved IOM – Executive Orders VR-201-B and VR-202-B (Wayne Harmony WayneVac Dispenser)
Page 107
Healy Systems, Inc.
Website: http://www.healysystems.com
18 Hampshire Drive
Email: [email protected]
Hudson, New Hampshire 03051 USA
Telephone: 603.882.2472
ARB Approved Installation, Operation and Maintenance Manual (November 2006) Fax: 603.882.5189
Healy Systems, Inc. – the innovative leader of Stage II vapor recovery equipment
5. TOOLS REQUIRED:
1/2” or 3/8” ratchet set w/ sockets 1/4” through 9/16” + 3” extension
9” lineman’s pliers
Assorted open end wrenches 1/4” through 3/4”
Wire cutters/strippers 18 AWG and 26 AWG
1-1/8” greenlee type sheet metal punch
Mechanical hand drill (egg-beater type)
Assorted drill bits 1/16” through 7/16”
Assorted screwdrivers (flat blade-one must be 1/8” wide and Phillips)
5/8” copper tube bending tool
5/8” copper tube flaring tool
Copper tubing cutter
Electrical multi-meter
Small hand brush (1-1/2” thick, for clearing chips)
12” adjustable wrench
10” pipe wrench
Tape measure
Allen wrenches
#20 torx bit
Whitney type hand sheet metal punch with 3/16” punch and die set
6. DISPENSER ACCESS:
Secure Dispenser Access keys from Station Management.
Lock-out and tag-out all electrical power to dispenser being modified.
Remove the Top Cladding and Upper Shield in order to expose upper vapor tubing
attached to the outlet castings.
Remove both Upper Column Covers above nozzle holsters in order to expose Wayne-
VAC
™
vacuum pumps.
Remove the Lower Column Cover below the nozzle holster on the “A” side of the
dispenser. This is the side that the vapor tubes from the out port of the Wayne-VAC
™
vacuum pumps are connected to a vapor tee mounted at the base of the dispenser, see
photo F.
Remove the Upper Cladding covering the “J” Box, see photo E.