64
4000511390
E03.16
USA / GB
HT21RT O - HT21RT O SW - HT61RT O - HT21RT PRO - HT21RT PRO SW - HT61RT PRO -
HT23RTJ O - HT23RTJ O SW - HT67RTJ O - HT23RTJ PRO - HT23RTJ PRO SW - HT67RTJ PRO
D
Inspection and maintenance schedule
Periodic inspection
In addition to the daily inspection
program
Visual inspection without disassembly
To check by test
Visual inspection with small disassembly or movement needed to reach
the part. Replacement is necessary.
Levelling
Proof tests. Need HAULOTTE Services® authorization. For countries
where machines are not subject to controlled periodic maintenance.
Functional adjustments / Checks
Yes
No
Corrected
Not
applicable
Manuals and displays. Clean or replace if necessary
.
Presence, cleanliness and legibility of the manufacturer's plate
Control box
Operation of emergency lowering device
Work Platform. Floor, guardrails, access and extensions
No cracks, broken weld, paint chipped
No deterioration and visible damage
Harness anchor points are not cracked or damaged, with the decal
attached and legible
No screws missing / loose parts
Entry bar/gate closes automatically and is not prevented from closing.
Locking in closed position of folding guard-rail (if equipped)
Work platform, floor, guardrails, access and extensions
No cracks, broken weld, paint chipped
No foreign body in joints or slides
Entry bar/gate closes automatically and is not prevented from closing
Locking in closed position of folding guard-rail (if equipped)
State of extension desk fastening
Lift assembly (jib, boom, mast, arm, turret)
No cracks, broken weld, paint chipped
Summary of Contents for HT21RT O
Page 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Page 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Page 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Page 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Page 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Page 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Page 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...