Upper boom
Procedure of dismantling / reassembling hydraulic rotary actuators
MS0028
8 - Installation and Bleeding
N.B.-:-T
O
AVOID
CONTAMINATION
TO
MACHINED
PARTS
: M
AKE
SURE
WORK
AREA
IS
CLEAN
.
After installation of the actuator on the equipment, it is important that all safety devices such as tie rods or safety cables
are properly reattached.
To purge air from the hydraulic lines, connect them together to create a closed loop and pump hydraulic fluid through
them. Review the OEM's operating manual and/or hydraulic schematic to determine which hydraulic lines to connect.
The linear feet and inside diameter of the hydraulic supply lines together with pump capacity will determine the amount
of pumping time required to fully purge the hydraulic system.
Bleeding may be necessary if excessive backlash is exhibited after the actuator is connected to the hydraulic system.
The OEM does not specify all actuators with bleed nipples ( A ), see the drawing below for their location. The following
steps are recommended when a minimum of 2 gallons ( 8 liters) is purged.
Avoid personal injury and machinery damage : Read the Service and Repair Manual for proper installation, maintenance
and repair procedure.
To avoid injury or damage to product : Secure produc to slotted table or vise.
Spraying fluids. Contents under pressure. Use caution when removing port plugs and fittings.
1.
Connect a x 5 inside diameter 3/16" outside diameter x
5*16" clear, vinyl drain tube to each of the 2 bleed nipples.
Secure them with hose clamps. Place the vinyl tubes in a
clean 5 gal container to collect the purged oil. The oil can
be returned to the reservoir after this procedure is comple-
ted.
2.
With an operator in the platform, open both bleed nipples
a 1/4 turn. Hydraulically rotate the platform to the end of
rotation (either clockwise or counterclockwise), and main-
tain hydraulic pressure. Oil with small air bubbles will be
seen flowing through the tubes. Allow a 1/2 gallon of fluid
to be purged from the actuator.
3.
Keep the fittings open and rotate the platform in the oppo-
site direction to the end position. Maintain hydraulic pres-
sure until an additional 1/2 gallon of fluid is pumped into
the container.
4.
Repeat steps 2 and 3. After the last 1/2 gallon is purged,
close both bleed nipples before rotating away from the end
position.
Summary of Contents for HT21RT O
Page 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Page 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Page 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Page 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Page 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Page 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Page 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...