169
4000511390
E03.16 USA
/
GB
Upper boom
Check and replacing the pads
MS0013
5 - Removing / Replacing the pads
Changing the top intermediate tube and telescope upper and side pads without removing the boom.
• Machine stowed (boom retracted and in horizontal position).
• Insert a pin to lock the tubes.
• Attach the platform with slings.
• Put the platform on a flat horizontal surface.
• Take off the rear hood by removing the 4 flanged nuts.
• Take off the connecting rod ( 1 ) by removing 2 pins ( 2 ) and ( 3 ).
Summary of Contents for HT21RT O
Page 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Page 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Page 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Page 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Page 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Page 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Page 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Page 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...