![Harris Legacy 99-1300-0 Operation & Technical Manual Download Page 15](http://html1.mh-extra.com/html/harris/legacy-99-1300-0/legacy-99-1300-0_operation-and-technical-manual_4027077015.webp)
2 Installation
Revision B • 1/03
H
A
R
R
I
S
C
O
R
P
O
R
A T
I
O
N
2-3
Meter Panel
The meter panel contains three horizontal bar-
graph meters. Two of the meters provide individual
level monitoring for the Program 1 and 2 out-
puts. The third meter is used to monitor the level
of Cue, Program 3 or 4, any external input, the
Send output, or the Telco Record output, as se-
lected on the Meter Switcher module. The level at
which the peak indicator (PK) comes on, as well
as the meter display mode (peak hold or non-peak
hold), may be set for each meter via DIP switches
on each meter display board.
The meter panel also contains a slaveable 12/
24-hour digital clock (HH:MM:SS) and an event
timer (MM:SS:T) that can be controlled manu-
ally, through buttons on the Meter Switcher mod-
ule, or automatically through module On com-
mands.
For additional information on the meter panel,
see pages 3-15 and 3-16.
CONNECTOR ACCESS
All module connectors are hidden below the
meter panel in normal operation. The meter panel
connects to the rear of the console by hinges. To
access the connectors, open the meter panel by
lifting it up and rotating it toward the rear of the
console until it stops.
Caution:
Make sure that the panel is open all
the way so that it does not accidentally fall shut.
To facilitate initial wiring, the meter panel can
be removed from the mainframe chassis.
To remove the meter panel from the mainframe:
1
Open the meter panel fully and unplug the
meter power cable (attached to the rear panel)
and the two cables (meter signals and talk-
back mic) from the Meter Switcher module.
2
With another person holding the meter panel,
remove the screws and bushings that attach
each gas spring to the meter panel. Lay the
gas springs on the mainframe while working.
3
Unlatch the hinges by moving the release pins
to their unlocked positions and lift the meter
panel up and off the mainframe.
To reinstall the meter panel, align the two halves
of the hinges, then release the pins out of their
unlocked positions.
Reattach each gas spring to the meter panel by
inserting a screw through the gas spring and the
bushing.
Main Meters
(Program 1 and 2)
Clock
Event
Timer
Aux Meter
(Meter Switcher: Displays
Cue, Program 3 or 4, Send,
or Telco Record)
Legacy Meter Panel
Summary of Contents for Legacy 99-1300-0
Page 2: ...Revision B 1 03 H A R R I S C O R P O R A T I O N ii...
Page 6: ...Revision B 1 03 H A R R I S C O R P O R A T I O N vi...
Page 43: ...2 Installation Revision B 1 03 H A R R I S C O R P O R A T I O N 2 31 BLANK PAGE...
Page 49: ...2 Installation Revision B 1 03 H A R R I S C O R P O R A T I O N 2 37 BLANK PAGE...
Page 68: ...Revision B 1 03 H A R R I S C O R P O R A T I O N 2 56 2 Installation BLANK PAGE...
Page 94: ...Revision B 1 03 H A R R I S C O R P O R A T I O N 5 4 5 Accessories BLANK PAGE...
Page 98: ...Revision B 1 03 H A R R I S C O R P O R A T I O N INDEX 4 Index BLANK PAGE...