Constellation™
November 2003
11-14 Field-Replaceable
Units
Transmitter Turn-on Procedure
1.
On the Transmitter Assembly, press the TX switch to the ON position.
2.
On the Power Supply, press the PWR switch to the ON position to turn on
the power supply.
and follow the steps under
"Transmitter Frequency Measurement"
and
"Transmitter Power Measurement"
MHSB System
1.
Use the Keypad command to take the switched unit out of
lock
status.
CONTROL > LOCK/IF LPBK > LOCK MOD/TX, CLR
CONTROL > LOCK/IF LPBK > LOCK DMOD/RX, CLR
2.
The standby RF units are now the primary RF units.
Switching the traffic back to the previous RF units
will cause a hit.
3.
If switching of RF units is desired, it should be done during low-traffic
hours.
Table 11-1: Required test equipment
Test Equipment
Model
Universal Frequency Counter with 10-digit
accuracy
Agilent 53131A or equivalent
Power meter with power sensor
Agilent E4418B and 8485A
or equivalent
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance...
Page 2: ......
Page 4: ...Constellation November 2003...
Page 18: ...Constellation November 2003 xii List of Figures...
Page 24: ...Constellation November 2003 xviii Preface...
Page 26: ...Constellation November 2003 xx Preface...
Page 96: ...Constellation November 2003 4 12 Loopback Testing...
Page 110: ...Constellation November 2003 5 14 Configuring the Constellation Radio...
Page 134: ...Constellation November 2003 7 14 SNMP Based Network Management...
Page 210: ...Constellation November 2003 11 36 Field Replaceable Units...
Page 238: ...Constellation November 2003 A 16 Wiring Specifications...
Page 260: ...Constellation November 2003 C 10 Hardware Compatibility Tables...
Page 276: ...Constellation November 2003 Glossary 6...
Page 291: ......