![Harris Constellation Installation & Maintenance Download Page 47](http://html2.mh-extra.com/html/harris/constellation/constellation_installation-and-maintenance_4014133047.webp)
Harris Corporation
Constellation™
SITE
PREP
ARATION
C
H A P T E R
2
S
ITE
P
REPARATION
Power Source
DC power source, 20 V to 60 V.
Equipment Rack Location
The equipment rack should be located in a sheltered area that provides proper
lighting, ventilation, and access to both the front and back of the Constellation
radio.
At least 3 feet of space must be between the equipment, strong magnetic fields,
and sources of impulse noise.
Equipment Inspection
Verify that the correct radio system is going to be installed.
•
Each Constellation radio has been set up at the factory according to the
customer’s specifications. To configure a radio for a different
application, contact the Harris MCD
Technical Assistance Center
(TAC). See
•
The Constellation radio is shipped fully assembled and ready to install.
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance...
Page 2: ......
Page 4: ...Constellation November 2003...
Page 18: ...Constellation November 2003 xii List of Figures...
Page 24: ...Constellation November 2003 xviii Preface...
Page 26: ...Constellation November 2003 xx Preface...
Page 96: ...Constellation November 2003 4 12 Loopback Testing...
Page 110: ...Constellation November 2003 5 14 Configuring the Constellation Radio...
Page 134: ...Constellation November 2003 7 14 SNMP Based Network Management...
Page 210: ...Constellation November 2003 11 36 Field Replaceable Units...
Page 238: ...Constellation November 2003 A 16 Wiring Specifications...
Page 260: ...Constellation November 2003 C 10 Hardware Compatibility Tables...
Page 276: ...Constellation November 2003 Glossary 6...
Page 291: ......