![Harris Constellation Installation & Maintenance Download Page 186](http://html2.mh-extra.com/html/harris/constellation/constellation_installation-and-maintenance_4014133186.webp)
Constellation™
November 2003
11-12 Field-Replaceable
Units
10.
Install the new OCXO onto the Transmitter Assembly, ensuring the
grommets remain in place.
11.
Plug the power connector onto the printed circuit board.
12.
Carefully plug the MCX connector into the receptacle designated
100MHZ
.
13.
Use a torque wrench to tighten (8-9 inch-pounds) the SMA connector you
installed in
14.
For Transmitter Assembly installation procedures, go to
Removing the Transmitter Assembly
•
In a MHSB configuration, start with
•
In a nonprotected configuration, start with
In a nonprotected configuration, removing the
Transmitter Assembly is a service-affecting
procedure.
1.
Use the Keypad command to
lock traffic
onto the standby Transmitter
and Receiver Assemblies. This step causes a minor alarm.
CONTROL > LOCK/IF LPBK > LOCK MOD/TX, SET
CONTROL > LOCK/IF LPBK > LOCK DMOD/RX, SET
Since switching of Transmitter Assembly is not
errorless, this procedure momentarily affects
customer traffic.
2.
Verify that the standby Transmitter and Receiver Assemblies are locked
and passing traffic.
3.
On the Transmitter Assembly you are removing, press the TX switch to the
OFF position to turn off the power amplifier.
4.
On the corresponding Power Supply, press the PWR switch to the OFF
position to turn off the power supply.
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance...
Page 2: ......
Page 4: ...Constellation November 2003...
Page 18: ...Constellation November 2003 xii List of Figures...
Page 24: ...Constellation November 2003 xviii Preface...
Page 26: ...Constellation November 2003 xx Preface...
Page 96: ...Constellation November 2003 4 12 Loopback Testing...
Page 110: ...Constellation November 2003 5 14 Configuring the Constellation Radio...
Page 134: ...Constellation November 2003 7 14 SNMP Based Network Management...
Page 210: ...Constellation November 2003 11 36 Field Replaceable Units...
Page 238: ...Constellation November 2003 A 16 Wiring Specifications...
Page 260: ...Constellation November 2003 C 10 Hardware Compatibility Tables...
Page 276: ...Constellation November 2003 Glossary 6...
Page 291: ......