Constellation™
November 2003
3-22 Installation
and
Commissioning
5.
Connect the battery power wires.
Harris recommends a separate fuse or circuit
breaker for Battery A and Battery B.
Circuit breaker or fuse, if used, should be turned
off or removed prior to connection of power wires.
Power Runs
The appropriate gauge wire should be used for the distance of each power run.
Harris recommends the following wire specifications for power runs
(
a.
Ensure that all the fuses in the fuse panel are in place.
Ensure that the power breaker is off.
b.
Connect the battery power wires.
•
If the radio is shipped in a rack, use the drawings in the sales order
specific information.
•
If the radio is shipped loose, continue with this step.
Office Battery Noise Level
(mV, peak to peak)
≤
50
Table 3-12: Wire specifications for power runs
Power Run
Wire Color
Wire Size
(AWG)
Battery A
Red
8
Battery B
White
8
DC return
Black
6
Ground
Green
6
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance...
Page 2: ......
Page 4: ...Constellation November 2003...
Page 18: ...Constellation November 2003 xii List of Figures...
Page 24: ...Constellation November 2003 xviii Preface...
Page 26: ...Constellation November 2003 xx Preface...
Page 96: ...Constellation November 2003 4 12 Loopback Testing...
Page 110: ...Constellation November 2003 5 14 Configuring the Constellation Radio...
Page 134: ...Constellation November 2003 7 14 SNMP Based Network Management...
Page 210: ...Constellation November 2003 11 36 Field Replaceable Units...
Page 238: ...Constellation November 2003 A 16 Wiring Specifications...
Page 260: ...Constellation November 2003 C 10 Hardware Compatibility Tables...
Page 276: ...Constellation November 2003 Glossary 6...
Page 291: ......