35
4 - Sprayer setup
General info
Unloading the Sprayer from the Truck
For the unloading of the sprayer, you need a crane. When unloading
with a crane please observe the lifting points as shown in the picture,
and make sure that the straps or belts used for lifting are strong enough.
μ
ATTENTION! Only lift the sprayer when the tanks are empty!
Pulling the Sprayer at the Tie Down Points
For moving the sprayer or loading it onto e.g. a truck, it can be pulled in
the tow hitches or pulling eyes at the rear-end (A), or a hook can be
fastened into the hole in the front end of the sprayer (B) as shown.
Before Putting the Sprayer into Operation
Although the sprayer has been supplied with a strong and protective surface treatment on steel parts, bolts etc. in the
factory, it is recommended to apply a film of anticorrosion oil (e.g. CASTROL RUSTILO or SHELL ENSIS FLUID) on all metal parts
in order to avoid chemicals and fertilizers discolouring the enamel.
If this is done before the sprayer is put into operation for the first time, it will always be easy to clean the sprayer and keep
the enamel clean for many years. This treatment should be carried out every time the protection film is washed off.
Summary of Contents for NAVIGATOR FORCE
Page 4: ...1 EU Declaration 4 ...
Page 12: ...2 Safety Notes 12 ...
Page 54: ...4 Sprayer setup 54 ...
Page 76: ...6 Maintenance 76 Boom lubrication oiling plan ...
Page 112: ...8 Technical specifications 112 ...
Page 116: ...Index 116 ...
Page 118: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...