43
x2
2 x 2-1/2 x 28-1/2" (5,1 x 6,3 x 72,4 cm)
ROR
2" (5,1 cm)
PARTS REQUIRED:
EAVE FASCIA
x24
BEGIN
¸
1
Install eave fascia boards
ROR
and
DKB
, as shown
(Fig. A)
.
Secure with 2" fi nishing nails.
You have installed your eave fascia.
FINISH
ROR
ROR
DKB
DKB
2
" (
5,1 cm)
Finishing
Nails
Fig. A
Flush to roof panels
and soffi t
x2
19/32
x 2-1/2
x 93" (
2,5 x 6,3 x
236,2 cm)
DKB
Flush at seam
Install all trim boards with the primed side facing out.