42
x2
2 x 3 x 49-1/2" (5,1 x 7,6 x 125,7 cm)
EFC
x2
OY
2 x 3 x 72" (5,1 x 7,6 x 182,9 cm)
PARTS REQUIRED:
EAVE SOFFIT
Place parts
OY
and
EFC
fl ush to bottom of roof overhang and wall panel as shown
(Fig. A)
.
Secure with 1-1/4" screws in the pattern shown.
FINISH
You have fi nished installing your eave soffi ts.
BEGIN
1
OY
EFC
EFC
OY
Flush
1-1/4
" (
3,2 cm)
Screws
1-1/4
" (
3,2 cm)
Screw
Flush
Fig. A
x32
1-1/4" (3,2 cm)