53
FINISH
Your gable vent, collar ties and door threshold are now installed.
x1
GABLE VENT, COLLAR TIES and DOOR THRESHOLD
PARTS REQUIRED:
BEGIN
¸
1
Caulk behind vent fl anges.
Install vent in front gable.
Secure with 1" screws.
x4
1" (2,5 cm)
Fig. B
(11) Special Coating Screws
3
Install metal threshold
(Fig. B)
.
2
x1
63-7/8" Metal Threshold
3/4" (1,9 cm) x11
Bagged separately / special coating
Install collar tie to the rafter with (3) 2" nails at each end
(Fig. A)
.
Starting at the wall with the door,
install (4) collar ties
GUA
on the four center rafters, as
shown.
HINT:
For best appearance, install collar
ties on back side of rafter, facing
away from door.
Fig. A
Flush to roof
panel
2"
(5,1 cm)
Nails
2" (5,1 cm)
x24
x4
1 x 4 x 60" (2,5 x 10,2 x 152,4 cm)
GUA