background image

!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$

;)#*3#(0%<.$12&$7%=(+4

>%%?,-./#0"1%@A@A

Assembly Book

the Roanoke III

Manufactured by Reynolds Building Systems, Inc.

                     205 Arlington Drive            Greenville, PA   16125

Sentry Buildings

:2B#$23%C-/#*%@D7%@A@E

EDFGH@F%;)#*3#(0

Summary of Contents for the Roanoke III

Page 1: ... 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Assembly Book the Roanoke III Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings 2B 23 C D7 A E EDFGH F 3 0 ...

Page 2: ...07 91 9 0 3 9 2 1 0 6 82 32 B2 23 8 2 4 6 82 2 12 32 B2 3 6 82 1 9 23 829 2 1 1 32 B2 1 L2 24 V 12 123 1 2 8 L 02 4 2 2 6 223 1 0 9 8 1 32 B2 2 4 Owner Supplied 9 0 2 7 21 9 23027 92 1 3 B2 1 1 2 2 4 22 1 2 8 L 02 9 M 1 1 223234 W 1 9 3 0 3 1 4 Assembly Help V 3 1 U 3 XAAR SYREYTT XZAA 1 YZAA 22L2 3 R 912 T SRXDDRSHYT 2 1 Z questions barnkits com J 8 2 K Care of product prior to assembly 2G 2 82 3...

Page 3: ...12 3 B2 23 6 1 HdSe 1 0 2 3 0 B2 6 3 9 04 Foundation TypesZ 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 C 926 3 992 2 1 1 2 9 9 3 1 2 6 82 64 2 L 1 2 Q 0 3 8 3 0 32 2M 2 2 1 2 4 LP siding YA 2 6 1 3 2 3 234 C 16 1 9 12G 1 9 1 2 9 14 W 1 1 2 8 11 2302 9 1 2 3 07 this is important4 V 1 De 1 Xe 9 2 2 9 1 2 8 11 2302 9 1 2 3 0 3 1 2 0 34 F1 6 0 32 1 8 3 3 L...

Page 4: ...1 2 f REd F 0 6 9 24 Y4 V L 8 1 9 2 FRear Wall Frames 3 21 9 2 324 H4 1 JTK 2B2 2R 1 6 1 3 821622 1 2 1 3 8 11 12 4 _ 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J K 16 ED3 0 B Q23 32 L 4 5 2 J K 16 EA3 123 L2 2 1 3 1 2 2 1 2 1 124 E4 1 J K 16 GSRXF J 2 6 82 1 2 123K 1 2 01 9 f REd e4 W 1 1 2 8 3 1 021 2 3 3 12 6 1 FgF L 6 2 2 1 2 6 1 3 6 82 1234 4 V L F F 6 2 2 821622 9 1 16 1 3 L 4 292 2 23 12 12 4 Stud S...

Page 5: ... Side Wall Frames 4 1 JTK 2B2 2R 1 6 1 3 821622 1 2 1 3 8 11 12 4 _ 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J K 16 ED3 0 B Q23 32 L 4 5 2 J K 16 EA3 123 L2 2 1 3 1 2 2 1 2 1 124 H4 2 2 1 1 8 3 1 2 fDe 0 6 9 24 S4 V L 1 2 9 2 FSide Wall Frames 3 21 9 2 324 Step 2 Assemble 2 Two 8 Long Side Wall Frames Stud Spacing X X X X X X X X 96 Top Wall Plate 96 Treated Bottom Plate 16 15 1 4 16 E4 2 2 1 J K 16 GSRX...

Page 6: ...L 8 1 9 2 FSide Wall Frames 3 21 9 2 324 Step 4 Assemble Door Header E4 1 J K 16 EAF 0 GX 8 3 1 2 01 9 ffe4 4 12 Se G SXe P 2 L23 L 14 The panel is located below the hardware in A pallet4 1 J K 16 TREdSe G SXe 9 2 1 9 1 821622 1 2 GX 8 3 4 H4 C 6 3 0 2 1 8 1 32 9 2 P 9 2 6 1 8 3 1 1 2 2 12 9 1 2 GX 8 3 4 _ 1 021 2 0 EA3 123 L2 4 5 2 JE K 162 B2 23 2B2 2 324 99 Long 2x8 48 OSB Filler GLUE 99 Long 2...

Page 7: ...X X X 96 Door Opening 2x4 Header Blocking 2x8 Door Header Pre cut 2x4 Studs 82 Header Support Studs 2x4 15 5 Treated Bottom Plate 96 Door Opening Width X X X X X X X X S S 4 C 2 8 2 1 2 9 1 6 9 2 0 1 2 6 12 1 8 B2 3 JXK 2 0 1 2R 1 6 1 3 4 5 2 ED3 0 B Q23 32 L 9 1 2 8 11 12 3 EA3 123 L2 9 1 2 1 124 H4 1 J K 16 2R 1 1 3 1 2 01 9 X e 3 1 1 2 2 32 1 0 JEAK 12 EA3 L2 4 1 1 2 GX 2 32 8 1 2R 0 1 2 2 3 1 ...

Page 8: ...1 3 K 4 92 1 2 End Wall Frames 8 Side Wall Frame Brace wall frames with pre cut wall studs End Marked C End Marked C H4 1 E F 9 27 2G1 1 1 2 9 1 XF 32 6 9 24 _ 9 2 1 021 2 6 2 2 1 2 8 11 6 1 JXK 2 0 1 EA3 L2 J 1 002 2 32 9 1 2 1 3 K4 12 Side Wall Frame Y4 1 12 32 6 9 2 4 D4 1 1 2 9 1 6 9 2 821622 1 2 32 6 9 2 4 2 2 9 2 1 021 2 1 1 2 2 0 JSK 9 EA3 L2 4 T4 _ 9 2 1 1 2 9 0 ED3 a B4 7 9 2 2 1 0 2 2 1 ...

Page 9: ... S4 1 1 2 GSRE F 8 3 1 2 2 32 6 9 24 Y4 1 1 9 1 3 1 GSRXF 8 3 1 9 4 D4 2 2 1 1 1 GS 1 2 12 1 2 12 326 9 2 4 Back Wall Frames E4 1 EDF 0 GS 1 2 8 L 6 4 5 2 EA3 L2 2 EDe 1 1 2 2 1 2 12 4 4 2 2 1 1 1 EDF 0 GS 1 2 12 1 2 12 9 1 6 4 Step 8A Install Siding on Wall Frames 12 Long 2x4 Tie Plate LP siding YA 2 6 1 3 2 3 234 C 16 1 9 12G 1 9 1 2 9 14 W 1 1 2 8 11 2302 9 1 2 3 07 this is important4 V 1 De 1 ...

Page 10: ...CWF 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 H 2 2 4 LAP Edge Side Wall Back Wall Install This Panel First Step 8B Install Siding on Wall Frames continued D4 1 1 2 9 6 31 3 0 1 2 0 1 32 9 1 2 3 2 04 T4 1 3 2 B2 GS 12 1 1 2G12 3 1 2 3 2 04 B2 1 2 GS7 1 6 82 23 12 12 4 H4 1 3 0 12 32 6 4 LAP Edge E4 1 9 6 31 3 0 2 1 2 32 6 6 1 1 2 F CWF 2302 9 6 1 1 2 GS 1 2 8 L 6 4 1 JTK 2B2 2 3 0 2 4 9 2 2 1 1 2 9 6 1 GS 9...

Page 11: ...GEA N 1 2 32 1 2 12 32 6 4 Step 9 Install 2x10 Joist Headers Step 10 Install 2x10 Joist Hangers 10d Sinker Nail 2x4 Tie Plate IMPORTANT If you purchased the optional stair kit go now to the instructions in the stair kit book to install the stairs floor joist and flooring Otherwise modify the instructions on Step 11 to provide another way to access to the loft area E4 1 XF 0 GEA 8 3 1 f REd e4 1 1 ...

Page 12: ...9 1 J3 6 K 1 HdSe ba 9 0 6 1 1 2 F 0 2F 2302 9 6 1 1 2 GS 1 2 12 32 6 4 1 002 1 2 2 12 1 0 112 J 22 82 6K4 1 2 1 8 L 6 4 2 2 9 0 6 1 X3 0 B Q23 32 L 23 E e 14 Step 12 Install Loft Flooring 4 x8 4 x4 4 x8 4 x8 Step 13 Not needed in this size kit Proceed to Step 14A Step 11 Install Floor Joist 192 Long 2x10 Floor Joist ...

Page 13: ...e it easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee H4 2 2 1 2 1 20 1 1 2 GS 12 6 1 J K 16 REd e 0 32 L 26 4 S4 1 YREd e G E e P 9 2 1 2 GD 1 20 2 GS 6 1 D3 4 G 1 0 F1 1 14 Y4 M 2 1 4 V2 2 3 0 9 1 2 L 22 9 1 2 GD 1 1 1 2 8 11 2 9 1 2 GS 124 2 2 2 2 1 6...

Page 14: ...2 1 2 XAREd e 1 3 1 1 2 2R8 1 9 2 0 REd e 26 4 Step 14B Assemble Rear Gable continued D4 1 T RYdXe 3 DSREd e 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 M 2 1 2 2 1 2 1 3 2 84 _ 1 GS 8 11 12 6 1 EA3 L2 3 26 1 GD 6 1 REd e 26 4 2 2 1 1 1 1 3 0 1 32 9 0 8 2 9 24 1 2 Gusset at Ridge 1 2 Gusset at Knee Y4 12 JHK 1 22 STRHdSe 0 GS 3 1 1 9 1 3 1 821622 9 2 4 cut to fit Studs Framing Square Framing Square 64 1...

Page 15: ...1 3 1 2 0 8 2 9 2 3 32 1 1 1 2 2 9 1 2 8 3 04 W 1 1 2 9 2 6 1 1 2 8 11 1 6 3 1 2 2 6 1 82 2 2 123 912 1 2 3 0 234 1 2R 1 3 0 2 6 1 1 2 F 1 2302F 9 6 1 1 2 291 32 9 1 2 0 8 2 9 24 2 3 0 3 2G12 3 HdSe 82 6 1 2 8 11 GS 0 8 2 124 1 3 0 6 1 X3 0 B4 4 H 1 J K 16 SGX 3 0 2 4 1 3 2 B2 3 0 1 1 2G12 3 8 B2 1 2 1 9 1 2 0 8 2 9 24 Siding Flush with Frame All trim is installed using 8d galvanized box nails spa...

Page 16: ... 8 G 4 Siding Extends Over Trim Paint edge Step 17 Install Rear Roof Gable 4 2 1 1 2 0 8 2 8 L 6 4 2 1 3 2 2 0 8 2 3 0 2G12 3 B2 1 8 L 6 4 2 12 0 8 2 6 1 8 11 GS 2G12 3 0 EREd e 1 62 6 GS 8 1 32 4 _ 1 9 0 EA3 L2 4 H4 2 B2 1 2 6 8 2 9 12 6 3 2 1 2 1 8 2 1 2 0 8 2 1 1 2 91 9 4 Brace Gable with Pre cut Studs E4 1 J K 16 GSRE F 8 3 1 2 8 L 6 1 2B2 1 1 2 0 8 2 9 9 0 99 3 0 0 8 2 1 1 4 1 J K 16 2 GSRE 8...

Page 17: ...GSRE F 8 3 23 9 8 0 8 L 0 8 2 3 2 2 1 Step 17 1 1 1 2 9 1 0 8 24 1 2 B2 GS 8 L 9 9 4 2 6 82 23 1 2 8 2 1 2 4 You can install the loft doors before you erect the gable Refer to Steps 27 and 30 if you want to install the doors and trim now Step 18 Assemble Install Front Gable Step 19 Install 2x6 Truss Plates Detail A E4 1 JHK 1 22 GDRTF 3 JEK 2 GDRE F 1 12 821622 1 2 9 1 3 2 0 8 2 6 2 2 32 6 4 1 1 2...

Page 18: ...8 2 1 4 5 2 T3 L2 0 6 2 2 1 3 2 1234 H4 1 3 8 2 GD 99 1 8 L 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 L 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 L 32 2 FgF 1 2 1 124 2 2 1 2 1 9 1 2 99 1 8 L 2 8 26 0 1 0 1 2 GD 1 1 2 99 1 8 L 6 1 REd e 32 L 26 4 EdXe 3 212 2 1 2B2 1 1 2 6 3 9 11 04 S4 2 2 1 2 99 1 8 L 2 6 1 REd e 32 L 26 4 2 1 2B2 1 1 2 6 3 9 11 04 2 8 11 9 8...

Page 19: ...4 1 1 32 1 2 GS 8 L 23 3 0 8 2 9 2 4 P 2 2 3 9 1 2 XERHdSe 0 GD 8 3 B2 8 2 L4 W 2 1 2 2 2 3 1 021 2 1 1 2 3024 C33 GS 8 L 1 1 2 8 11 9 1 2 1 20 1 L22 1 GD 9 B 04 4 2 2 1 2 GD 8 3 1 021 2 0 2R 1 6 3 0 21 4 i 22 0 21 2 Se 6 324 302 0 21 HERHdSe 6 324 C 6 3 0 2 6 1 8 821622 1 2 0 21 3 1 2 GD 8 3 4 2 2 0 21 6 1 JHK 1 22 6 9 D3 23 De 14 Importanth 6 2 1 0 1 2 0 21 1 1 2 L 227 1 0 21 6 1 1 2 12 1 0 23 3...

Page 20: ... 4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 L4 H4 1 99 1 2 1 2 12 6 4 E4 1 GD 02 B2 1 2 FgF L 1 2 1 12 3 9 6 1 1 32 2302 9 GD4 5 2 EREd e N 1 02 4 21 1 20 1 02 4 5 2 EA3 123 L2 1 2 2 1 2 1 1 1 2 21 02 J 2 02 2 2 21 1 0 32 1 2 1 1 2 2 1 0 2K4 4 2 B2 1 2 GSRE F 8 3 23 1 8 2 1 2 9 1 0 8 24 C 0 2 211 0 1 2 1 L 1 2 2 8 3 1 L22 1 2 84 F1 2 B2 1 2 GS 1 1 2 9 2 1 0 234 Cut Edge S4 1 EGS 2 1 32 99 1...

Page 21: ...25A Install Roof Sheathing S4 1 99 1 2 1 9 1 82R 1622 1 2 1 99 1 2 3 1 2 2 L4 Y4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 GS4 8 Soffit Panels 8 Soffit Panel 302 j2 1 LAP Edges 0 2 C 2 H4 1 J K 16 Xe 6 32 G SXRHdSe 99 1 2 32 1 2 GS 6 1 23 32 3 6 3 1 2 F CWF 2302 1 021 2 1 1 2 L 22 9 1 2 0 8 24 5 2 EREdSe 1 2 1 26 23 E e 14 E4 V L2 2 1 1 2 1 2 3 1 2 0 8 2 2 84 9 2 1 0 302 B2 17 1 1 2 1 6 9 9 2 1 0 Ee 82 6 1 2 ...

Page 22: ... 2 4 2 9 2 1 0 3 221 1 2 12 9 1 2 1 2 4 S4 1 P 9 6 1 8 L 0 8 2 3 04 Y4 1 1 2 8 11 6 9 2 1 0 1 6 31 9 HDe 2 14 D4 1 1 6 9 2 1 0 1 9 14 P 7 1 Ee 62 1 6 9 B2 1 04 1 JEK 2 821622 2 1 9 1 64 T4 2 2 1 12 32 9 8 3 04 Install this Row First 48 x 96 48 x 96 48 x 96 96 Long 36 x 96 36 x 48 48 x 83 Front Gable 48 x59 Roof Sheathing 48 x83 Roof Sheathing Straight Edge Cut Top Row Width Install Upper Sheathing...

Page 23: ... 0 1 2 2 0 8 24 5 2 EREdSe 1 26 1 2 2 1 2 99 1 2 1 1 2 GS 4 5 2 T3 L2 1 2 2 1 2 9 2 1 0 1 1 2 GS 4 4 2 1 3 2 2 X RYdXe 0 GS 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x4x81 3 4 2x4x82 5 8 H4 1 HREd e G Xe 1 8 3 1 1 2 8 11 9 1 2 GS 0 EREdSe 1 26 4 ...

Page 24: ...32 1 4 1 1 HdSe 82 6 1 2 3 2 044 1x6 Keystone 48 3 4 Door Trim 85 Door Trim Step 28 Install Door Trim Blue Ends Together Step 26B Install Gable Trim continued Trim 3 4 Above Opening Trim 3 4 Below Opening Step 27 Install Loft Door Trim E4 1 L2 1 2 1 8 3 HdSk 8 B2 1 2 2 12 9 1 2 3 2 04 5 2 X3 0 B4 4 2 2G 23 3 0 6 2 B2 3 1 6 2 1 2 3 2 234 H 1 J K 16 EGSRXYe 0 1 8 3 9 1 1 2 32 9 1 2 3 2 04 L 1 2 2 8 ...

Page 25: ...eft Door Sliding Bolt on the back of left door Y4 1 3 0 8 17 1 2 62 8 L 9 1 2 3 1 2 2 1 3 2 6 2 234 I 6 223 1 3 2 9 1 2 3 91 1 3 1 4 OSB Shim Siding Extends Past Trim Step 29 Install Doors E4 1 2 291 3 6 1 1 2 1 9 0 4 2 GS 9 2 1 2 291 3 2G12 3 1 1 2 3 1 4 22 321 82 64 4 1 De 02 1 1 2 291 32 9 1 2 3 9 24 1 1 2 02 2 7 3 1 2 2 1 0 12 0 1 1 2 9 24 L22 1 2 9 2 9 11 07 3 EdXe 2 4 5 2 ERTdXe 8 L 26 4 H4 ...

Page 26: ... 82 3 6 82 64 Left Door Bottom 4 1 1 2 EREd e 6 32 3 0 2 1 1 2 1 2 3 9 27 9 6 1 1 2 291 9 1 2 3 9 2 4 U 2 6 2G12 3 HdSe 82 3 3 0 1 2 0 1 324 Right Door H4 1 Se 3 02 1 1 2 91 3 4 EdXe 2 1 L22 1 2 9 2 9 11 04 5 2 1 2 12 EREdSe 8 L 02 26 4 S4 1 1 2 291 3 9 14 2 3 0 1 2 291 3 2G12 3 82 3 1 2 3 9 24 2 2 1 2 02 1 1 2 EGH 1 6 1 ERHdSe 26 4 Y4 1 1 2 0 1 3 4 1 8 2 8 1 7 to the back of door7 1 1 2 1 3 8 11 ...

Page 27: ... 21 X 2 4 HAe G EEREd e i 22 a 21 2 4 YREdSe G SXe W 23 99 1 W 82 S 2 4 GD V21 O 02 D 2 4 GEA V21 O 02 E 8 D3 3 EA3 L2 Qty Material Shipped by Local Supplier X GS R W 2R 1 1 3 S GS XF W 12 J1 2 123K S GS E F W 12 J1 2 123K E GS EDF 12 J1 2 123K D GS XF U 0 82 S GS EAF U 0 82 E GS E F U 0 82 H GS EDF U 0 82 GD E F U 0 82 X EGS XF 4W4 3 S EGS EAF 4W4 3 X EGH XF 4W4 1 0 3 GX EAF O2 32 ED SGX HdSe ba ...

Page 28: ... 2 EfREdSeG SXe D R 20 GD G TERHdXe D W 12 GD G XSe S a 8 2 PB2 0 GS G X RYdXe S a 8 2 1 3 GS G XAREd e S a 8 2 1 3 GS G T RYdXe E a 8 2 1 3 GS G DSREd e D a 8 2 U 0 GS G STRHdSe U 1 a 8 2 PB2 0 EGS G Xe EX 99 1 L GD G EAe S 8 2 99 1 L GD G EAe H TdEDe P 2 1 0 SXe G XHe TdEDe P 2 1 0 SXe G T e S TdEDe P 2 1 0 SXe G Yfe E P O2 32 U 2 HRHdSe G SXe S W 63 a 1 EERHdSe G HAe EX Ed e P a 8 2 U 2 J 22 32...

Reviews: