![Hagie UpFront GST 20 Operator'S Manual Download Page 74](http://html1.mh-extra.com/html/hagie/upfront-gst-20/upfront-gst-20_operators-manual_3208785074.webp)
V.
CALIBRATION
B. PROGRAMMING THE RAVEN CONSOLE
71
THIS IS JUST A GUIDE TO GET STARTED!
REFER TO THE RAVEN INSTALLATION
AND OPERATION MANUAL FOR MORE INFORMATION AND TROUBLE SHOOTING.
Depress the
to
enter the
BOOM CAL
number.
BOOM
CAL
3
After depressing the
key, the
key and
the
key will allow you to scroll through the
different boom numbers.
To determine the
BOOM CAL
number, you will
need to know how the boom is divided (the number of
valves and what they control), the spacing option in-
stalled, and the number of nozzles per section.
The boom is numbered from left to right which is
your “BOOM #” and corresponds with the BOOM
SPRAY SECTION switches on the console.
To get the
BOOM CAL
number, multiply the num-
ber of nozzle tips by the spacing in inches.
You must enter “0” in Boom Cal 1 and 7.
BOOM
CAL
3
1
2
60/80/90 foot boom system
with all extensions folded
out.
90 feet
BOOM #2
BOOM #3
BOOM #4
BOOM #5
BOOM #6
* remember that there is a blank in the first position, therefore your calibration will begin with BOOM #2.
CALIBRATION