61
OPERATING SYSTEMS
IV.
OPERATING SYSTEMS
E. OPERATING THE QUICK-ATTACH SYSTEM
FOLLOW THESE STEPS:
1. Square up to the boom. Make sure the quick attach lock assem-
blies are open.
2. Pull into the boom
slowly
.
3. Once you are pulled in squarely to the boom, check to see that the
quick attach hooks are high enough to go over the lock pins. If the
hooks are high enough, no adjustments need to be made to the
machine. Continue to pull into the boom until the hook openings
are above the lock pins.
4. Turn the engine OFF before connecting any hoses or electrical
lines.
5. Re-attach all solution lines, electrical lines, and hydraulic lines. If
you are attaching to something other than the boom, be sure you
read the operators’ manual for the attachment to know what lines
will need to be hooked up and where the connection is.
6. Lift the boom until the hooks have engaged fully.
7. Lock the quick attach lock assemblies. Be sure that the assembly
is fully engaged!
8. Put the boom stands in the “travel position”.
9. Continue with your spray job.
CONNECTING BOOM TO THE MACHINE
PAGE AND FIGURE REFERENCE
62
62
62; FIGURE 4.62-1
62; FIGURES 4.62-2
63; FIGURE 4.63-1
63; FIGURE 4.63-1
63; FIGURE 4.63-2
63; FIGURE 4.63-3