12
III.
PREPARING TO OPERATE
Attach Outrigger Fold Stack Valve –
Attach the outrigger hydraulic fold stack valve (fig. 3.9, item 1) in
the center of the tool bar with supplied mounting bracket and hardware. Refer to 2101 SPRAYER/
DETASSELER Parts Manual for correct hardware and hydraulic schematic. Attach supplied wire harness to
boom control stack valve wire harness connection (see page 9). Refer to 2101 SPRAYER/DETASSELER
Parts Manual for correct fold stack valve wiring schematic.
Attach Outrigger Fold Cylinders –
Attach the outrigger fold cylinders (fig. 3.9, item 3) with supplied
hardware according to 2101 SPRAYER/DETASSELER Parts Manual. Also refer to 2100 SPRAYER/
DETASSELER Parts Manual for correct hydraulic schematic.
Attach Lift Arm Stack Valve –
Attach the hydraulic lift arm stack valve (fig. 3.9, item 2) toward the left
of the tool bar with supplied mounting bracket and hardware. Refer to 2101 SPRAYER/DETASSELER
Parts Manual for correct hardware and hydraulic schematic. Attach supplied wire harness(es) to “jumper”
panel (see page 22). Refer to 21001SPRAYER/DETASSELER Parts Manual for correct lift stack valve wir-
ing schematic.
ATTACHING EQUIPMENT CONTINUED
FIG 3.9
1
2
3