![Hach sc200 User Manual Download Page 701](http://html.mh-extra.com/html/hach/sc200/sc200_user-manual_576786701.webp)
80459-641-01E
Model 6 Motor Control Centers
10/2012
Section 4—Installing the MCC
© 1999–2012 Schneider Electric All Rights Reserved
29
ENGLISH
Splicing With No P Gasketing
1. Turn off all power supplying this equipment before working on or inside
the equipment, and follow lockout/tagout procedures. Always use a
properly rated voltage sensing device to confirm the power is off.
2. If splicing to an existing MCC, remove the end plate and any gasketing
from the existing MCC.
3. Remove the white paper backing from the new gaskets (supplied by
Schneider Electric) to expose the adhesive. This adhesive temporarily
holds the gaskets in place while the sections are being positioned.
4. Apply P gaskets to the outside of the front and rear vertical corner
channels (see Figure 18 on page 28). The gaskets should not extend
above the top of the corner channels.
5. Apply flat gaskets to the outside of the top and bottom tie channels. The
gaskets should not extend above the top of the tie channels.
6. Applying thumb pressure, firmly press the gaskets in place from top to
bottom. Verify that the gaskets are flat along the entire length.
7. Join sections together following the appropriate steps in “Joining NEMA
Type 1 / NEMA Type 1 Gasketed / NEMA Type 12 Sections” on page 20.
NOTE:
When new sections will be added to left side of existing line-up,
follow Steps 1, 2, and 7 only.
Splicing With P Gasketing
Determine the location of the existing P gasket before splicing. If the P
gasket is on the left (see Figure 18 on page 28), follow the instructions
“Splice to Existing Left”. If the P gasket is on the right (see Figure 18 on
page 28), follow the instructions “Splice to Existing Right”.
Splice to Existing Left
1. Turn off all power supplying this equipment before working on or inside
the equipment, and follow lockout/tagout procedures. Always use a
properly rated voltage sensing device to confirm the power is off.
2. Remove the end plate and all flat gaskets from the existing MCC. Leave
the P gasket on the existing front corner channel in place.
3. Remove the factory installed flat gasket from the front corner channel of
the new vertical section.
4. Join sections together following the appropriate steps in “Joining NEMA
Type 1 / NEMA Type 1 Gasketed / NEMA Type 12 Sections” on page 20.
Splice to Existing Right
1. Turn off all power supplying this equipment before working on or inside
the equipment, and follow lockout/tagout procedures. Always use a
properly rated voltage sensing device to confirm the power is off.
2. Remove the end plate and all flat gaskets from the existing MCC. The
P gasket on the existing front corner channel should be left in place.
3. Remove the white paper backing from the new gaskets (supplied by
Schneider Electric) to expose the adhesive. This adhesive temporarily
holds the gasket in place while the sections are being positioned.
4. Apply a P gasket to the outside of the rear vertical corner channel
(see Figure 18 on page 28). The gasket should not extend above the top
of the corner channel. Retain the extra P gasket for future use.
5. Apply flat gaskets to the outside of the top and bottom tie channels. The
gaskets should not extend above the top of the tie channels.
6. Applying thumb pressure, firmly press the gasket in place from top to
bottom. Ensure that the gasket is flat along the entire length.
7. Join sections together following the appropriate steps in “Joining NEMA
Type 1 / NEMA Type 1 Gasketed / NEMA Type 12 Sections” on page 20.
Summary of Contents for sc200
Page 5: ...DOC023 53 80040 sc200 Controller 01 2014 Edition 7 User Manual ...
Page 6: ......
Page 10: ...Table of Contents 4 ...
Page 20: ...14 nglisK ...
Page 23: ... nglisK 17 ...
Page 53: ......
Page 56: ...Visit us at www hach com ...
Page 74: ...20 Installation ...
Page 90: ...Visit us at www hach com Maintenance ...
Page 96: ...Visit us at www hach com ...
Page 100: ...Visit us at www hach com ...
Page 106: ...Visit us at www hach com ...
Page 108: ...Visit us at www hach com ...
Page 110: ...Visit us at www hach com ...
Page 115: ......
Page 148: ...Figure 4 5 Transistor Outputs 4 8 ...
Page 176: ...Figure 8 1 Dimensions 8 2 ...
Page 195: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 265: ...Figure 1 1 Typical ModBUS Network Topography 1 3 ...
Page 267: ...Figure 1 2 Typical Communications Wiring Scheme 1 5 ...
Page 268: ...Figure 1 3 Signal Boost Sensor Diagram 1 6 ...
Page 270: ...Figure 2 1 Typical Communication Cable Wiring for Signal Boost Option 2 2 ...
Page 271: ...Figure 2 2 Sensor Display Screens 2 3 ...
Page 290: ......
Page 292: ......
Page 348: ...PAGE 54 APPENDIX D MOUNTING 15 APPENDIX D MOUNTING Figure 9 Mounting Detail ...
Page 351: ......
Page 352: ...Powerware Series Eaton 9130 UPS 700 3000 VA User s Guide ...
Page 472: ... 0 5 3 5 6 A B 3 4 ñ 4 9 0 ñ ñ ñ 2 ñ 5 7 8 1 5 CB N4 C N4 9 2 2 6 9 E 3 7 2 5 0 0 2 3 2 ...
Page 473: ... 0 5 3 5 6 A B 3 4 ñ 4 9 0 ñ ñ ñ 2 ñ 5 5 3 0 44 7 3 7 4 2 K 3 50 0 ...
Page 476: ......
Page 477: ......
Page 479: ......
Page 555: ......
Page 556: ......
Page 557: ......
Page 558: ......
Page 559: ......
Page 560: ......
Page 561: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 562: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 563: ...UNIT HEATERS FOR STEAM OR HOT WATER Rosemex Products HEATING 01 2003 ...
Page 571: ......
Page 579: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 584: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 Ƭ ...
Page 594: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ȋ Ȍ ...
Page 624: ......
Page 625: ......
Page 626: ......
Page 627: ......
Page 628: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 636: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 637: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......
Page 644: ......
Page 645: ......
Page 646: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ǡ ǡ ...
Page 650: ... 2014 Pentair Equipment Protection PH 763 422 2211 hoffmanonline com 87563688 4 M5 9 1 2 3 4 ...
Page 651: ... 2014 Pentair Equipment Protection PH 763 422 2211 hoffmanonline com 87563688 5 ...
Page 653: ... 2014 Pentair Equipment Protection PH 763 422 2211 hoffmanonline com 87563688 7 3 3 7 7 3 3 ...
Page 654: ... 2014 Pentair Equipment Protection PH 763 422 2211 hoffmanonline com 87563688 8 1 2 4X 8X 1X ...
Page 672: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 805: ...Notes ENGLISH ...
Page 806: ...Notes ENGLISH ...
Page 807: ...Notes ENGLISH ...
Page 809: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 810: ......
Page 811: ......
Page 812: ......
Page 861: ... ǁǁǁ ǁŝůĚƐƚŽŶĞ ĐŽŵ 2 0DLQ 6WUHHW 3K 3HQWLFWRQ D DQDGD 9 ...
Page 862: ......
Page 863: ......
Page 864: ......
Page 865: ......
Page 866: ......
Page 867: ......
Page 868: ......
Page 869: ......
Page 870: ......
Page 871: ......
Page 872: ......
Page 873: ......
Page 874: ......
Page 875: ......