30
GVM-VAC
www.gvm-vac.com
Operating Section
3.1 Starting Engine
Review the Engine Operating Manual supplied with your
leaf vacuum for specific start-up, maintenance and op
-
erating instructions. It is especially important to review
break-in service procedures for brand new units.
Always make sure the PTO is disengaged before
starting unit.
Thoroughly read and understand the
safety and pre-operating sections of
this manual before staring the en-
gine.
figure 3.1a
1. Perform all the pre-starting, pre-operating checks out-
lined in the EOM and in this manual.
2.
Make sure the PTO is disengaged as shown in figure
3b.
3. Turn on the engine heater by turning the ignition
switch to the left for at least 15 seconds. In colder
weather you may need to hold this switch for longer,
but not to exceed 60 seconds.
4. Depress and hold the Murphy switch while starting.
IMPORTANT: Do not operate the starter for more
than 30 seconds at a time. To do so may overheat
the starter. If the engine does not start the first time,
wait at least 2 minutes before trying again. If the
engine fails to start after 4 attempts, see the trouble
shooting section of the EOM and this manual.
DO NOT start the engine in an enclosed building.
Proper ventilation is required before starting the
engine.
Starting Procedure (refer to figure 3a):
Summary of Contents for GVM6600-CM
Page 15: ...15 GVM VAC www gvm vac com SAFETY PRECAUTIONS 1 4 Safety Decals ...
Page 72: ...72 GVM VAC www gvm vac com Service Section 5 10 5 Engine Wiring Harness Detail D ...
Page 77: ...77 GVM VAC www gvm vac com Service Section 5 20 1 Hoist Hydraulic Diagram ...
Page 101: ...101 GVM VAC www gvm vac com 7 5 Kraft Fluid Drive Group Optional Fluid Drive Coupler Optional ...