26
GVM-VAC
www.gvm-vac.com
Pre-Operating Section
Failure to verify the road worthiness of the leaf vacuum and the
truck and verify all equipment is properly stowed, may cause seri-
ous injury or death to yourself or others.
Do not tow the leaf vacuum unless all important checks listed below
are completed.
2.4 PRE-TRANSPORT CHECKS
IMPORTANT CHECKS:
1.
2.
3.
4.
5.
6.
7.
8
The hose boom is properly secured.
a. Be sure nozzle is in the cradle securely.
The unit's lighting is operating properly.
Check the general condition of the tires, tire pressure and ensure that
all lug nuts are securely fastened.
Visual examination of the leaf vacuum frame, suspension and struc-
ture to determine if all components are correctly positioned and se-
cured for travel.
Check the intake hose boom to verify that it is securely fastened to the
leaf vacuum and can not swing free.
Verify there are no loose tools or materials on the unit, inside the in-
take and exhaust hoses, or inside the engine sheet metal.
Check all cones, wheel-chocks, signs or other support tools and mate-
rials to ensure proper stowage.
Verify the driver of the unit is qualified to tow the type and weight of
the unit.
Summary of Contents for GVM6600-CM
Page 15: ...15 GVM VAC www gvm vac com SAFETY PRECAUTIONS 1 4 Safety Decals ...
Page 72: ...72 GVM VAC www gvm vac com Service Section 5 10 5 Engine Wiring Harness Detail D ...
Page 77: ...77 GVM VAC www gvm vac com Service Section 5 20 1 Hoist Hydraulic Diagram ...
Page 101: ...101 GVM VAC www gvm vac com 7 5 Kraft Fluid Drive Group Optional Fluid Drive Coupler Optional ...