© Guldmann
GB/US
-09/2016 •
#550376_3
7
GENERAL INFORMA
TION
General conditions
Placing a new Hoist in an existing rail system.
Please notice, before placing a new hoist in an existing rail
system it must be ensured:
• The rated max load of the rail system, must be equal or
higher than the max load of the new hoist .
– If there is no max load mentioned on the rail system,
the rail system must then be checked according
to the guideline in the Installation guide (distance
between bracket according to max load)
– If the brackets are not visible, then a load test with 1,5
x max load of the hoist must be performed minimum
20 min . The deflection of rails must not be higher than
1/200 of the length of the rail .
– If it is not possible to do any of the above mentioned,
please contact Guldmann or their representative .
• If the rail system can not be rated to the same max
load as the hoist, then extra brackets must be installed
according to the Installation guide (distance between
bracket according to max load) .
Class I equipment
Fixed rail systems are class I equipment and must be
installed by a qualified technician or by Guldmann Service
Team .
Equipment is disconnected from Supply Mains by breaking
the mains breaker switch .
Class II equipment
Mobile equipment is class II epuipment (marked with dou-
ble-encassed symbol) and can be connected to the mains
direct by the user .
Equipment is disconnected from Supply Mains by detach-
ing the mains plug from the wall outlet .
Emergency stop device
The emergency stop device must be reset in order to con-
nect power to the product . To do this, push the yellow reset
button .
Spare parts
Only original spare parts must be used according to UL
approval .
Installing heavy duty rail systems
Bracket types must be chosen in accordance with the list
of components, certain types of bracket must not be used
in connection with these installations .
A heavy duty model traverse travelling trolley must be used
in connection with room-covering rail systems rated 500 kg
(1100 lbs) .
The distance between brackets must be adapted to the
type of rail in question in accordance with the instructions .
Two installation elements, a glue anchor or expansion bolts
must be used per bracket when installing the system in a
concrete ceiling or wall, in accordance with the instructions .
Ceilings and walls made of materials other than concrete
must be carefully inspected and tested for suitability .
Special care should be taken when testing at 1 .5 x the
rated load .
The strape shall be inspected at an annual inspection .
The patient is protected by free fall safety mechanics if the
timing belt failes .
The hand control and cable must be free from the hanger,
patient or any other object before the hoist is activated up
or down .
Note!
GH3 hoists may not be installed higher than 3000 m above
sea level .
Environment:
Condition of operation must be in the range of:
Temperature between -10 and +40°C / 14 and 104°F
Relative air humidity between 30 and 70 %
Air pressure between 70 and 106 kPa
(See symbols page 8)
Hoist and transformer is not suitable for use in the pres-
ence of a flammable anaesthetic mixture or with oxygen or
nitrous oxide .
Summary of Contents for GH1 F
Page 20: ... Guldmann GB US 09 2016 550376_3 22 GENERAL INFORMATION ...
Page 151: ... Guldmann GB US 09 2016 550376_3 153 TECHNICAL DRAWINGS Jumper settings GH3 GH3 Twin ...
Page 158: ... Guldmann GB US 09 2016 550376_3 160 TECHNICAL DRAWINGS ...
Page 164: ... Guldmann GB US 09 2016 550376_3 166 NOTES ...
Page 165: ... Guldmann GB US 09 2016 550376_3 167 NOTES ...
Page 166: ... Guldmann GB US 09 2016 550376_3 168 NOTES ...