© Guldmann
GB/US
-09/2016 •
#550376_3
43
SERVICE AND
REP
AIR
GH3
Replacing the leader motor safety PCB
Before removing the leader Motor Safety PCB it is impor-
tant to upload hoist data on to your computer or note
book . This will be done through the Guldmann service
console . The data is to be saved and loaded on to the
replacement PCB . (Follow the instructions in the SIC Tech-
nicians Manual) .
After data has been uploaded disconnect batteries see
page 27 . And remove bottom cover by laying hoist on
top cover see page 36 .
Disconnect any wires from the PCB remembering were
they are connected . Taking a photo before unplugging
wires is a good way to record this, also see wiring dia-
grams at back of manual .
Summary of Contents for GH1 F
Page 20: ... Guldmann GB US 09 2016 550376_3 22 GENERAL INFORMATION ...
Page 151: ... Guldmann GB US 09 2016 550376_3 153 TECHNICAL DRAWINGS Jumper settings GH3 GH3 Twin ...
Page 158: ... Guldmann GB US 09 2016 550376_3 160 TECHNICAL DRAWINGS ...
Page 164: ... Guldmann GB US 09 2016 550376_3 166 NOTES ...
Page 165: ... Guldmann GB US 09 2016 550376_3 167 NOTES ...
Page 166: ... Guldmann GB US 09 2016 550376_3 168 NOTES ...