Procedure
1. Remove the bolts (A) and the
washers (B).
2. Tilt the output (C).
3. Remove the hinges (D) from the holes
(E).
4. Remove the output.
7.3.3
Remove the input
Note:
Two persons are required to remove the input. The input is heavy.
Preliminary requirements
•
Wrench size 13
A
B
C
D
E
Corrective maintenance
36
D09-GS13S50-
1
2