5. Installation
28
PNEG-1162CEX
DMC DIII Stir-Ator
Figure 5AS Assemble Suspension Chains
12. Stir-Ator height can be adjusted at the chains.
13. Lift the track unit onto the bin wall track. Install the two (2) track hold-down pins with the pin
heads located directly under the lower track edge, secure with two (2) 5/32" x 1" cotter pins.
(See Figure 5AT and Figure 5AU.)
Figure 5AT Lift Track Drive onto Rails
Figure 5AU Fit Hold-down Pins
14. To prevent the stirrer from moving on the rails we recommend locking it in place with vise grips.