Locating Discharge Opening
1. The last bolt hole in the chute should line up with the center of the discharge chute opening that is to
be cut. Therefore, you should be able to approximate an opening by measuring 9-1/2 in. above and
below the last bolt hole of the chute. Mark horizontal cut lines.
2. To find the vertical center of the chute opening, measure over 11 in. to the right and left of the chute
bolt rows. Mark center point. Then from the center point, measure 7 in. on both sides and mark verti-
cal cut lines.
3. Cut opening where marked, make sure corners have a minimum of 1-1/2 in. radius.
Figure 9-18
Locating Discharge Opening
A
22 in.
E
14 in.
B
11 in.
F
7 in.
C
19 in.
G
1-1/2 in. minimum radius at corners
D
9-1/2 in.
H
5
th
ring side sheet from base
PNEG-4472
72 Ft Diameter Z-Tek Bins
161
Summary of Contents for 40-SERIES
Page 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...