Installing the Upper Stand-off Support Brackets
Four upper stand-off support brackets are attached to the top panels and allow support for a conveyor or
catwalk system.
1. Locate the eight sets of four holes in the top panels (B), align the gaskets (A) with the set of four
holes on the top panels (B) where the upper stand-off support brackets (C) will be installed.
2. Position the eight upper stand-off support brackets (C) against the against the gaskets (A) and align
the holes.
3. Install flange bolts (D) and flange nuts (E) to secure the upper stand-off support brackets (C) and
lower stand-off support brackets (F) together with the top panels (B).
NOTE:
Make sure the end lines in the stand-off brackets are vertical.
Figure 8-36
Installing the upper stand-off support brackets
A
Gasket (S-10378)
D
3/8 x 1-1/2 in. flange bolt with sealing washer
(S-7488)
B
Top panel (CTR-1585)
E
3/8 in flange nut (S-9426)
C
Upper stand-off support bracket (CTR-
1559)
F
Lower stand-off support bracket (CTR-1559)
PNEG-4472
72 Ft Diameter Z-Tek Bins
133
Summary of Contents for 40-SERIES
Page 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...