Automatic water analysis system
GENO-softwatch Komfort
Order no. 145 172 955-inter Edited by: phar-mrie G:\BA-172955-INTER_145_GENO-SOFTWATCH KOMFORT
7
3.2 Operating
personnel
Only allow persons who have read and understood this operation
manual to work with the system. Strictly observe the safety
information.
3.3 Intended use
The system may only be used for the purpose outlined in the product
description (chapter C). The guidelines in this operation manual as
well as the applicable local guidelines concerning drinking water
protection, accident prevention and occupational safety must be
observed.
In addition, intended use also implies that the system may only be
operated when it is in proper working order.
Any errors must be eliminated at once.
3.4 Protection from
water damage
Warning!
In order to properly protect the installation site against
water damage:
a) A sufficiently dimensioned floor drain system must be available or
b) A water stop device must be installed.
Warning!
Floor drains that discharge to a lifting system will not work
in case of a power failure.
3.5 Indication of
specific dangers
Danger due to electrical energy!
Do not touch electrical
components with wet hands! Disconnect the system from the mains
before starting work on electrical system components. Have qualified
experts replace damaged cables immediately.
Danger due to mechanical energy! System components may be
subject to overpressure. Danger of injury and damage to property due
to escaping water and the unexpected movement of system parts.
Check pressure pipes regularly. Depressurise the system before
starting repair or maintenance work on the system.
Hazardous to health due to contaminated drinking water!
The system
shall be installed only by a specialist company. Strictly observe the
operation manual! Ensure that there is sufficient flow; the relevant
guidelines must be followed for commissioning after extended periods
of standstill. Inspections and maintenance must be performed at the
intervals specified!
Note:
By concluding a maintenance contract, you ensure that all
of the required tasks are performed on time. You may perform the
interim inspections yourself.