Installation
The installation is only allowed to be carried out by a specialist installer.
NOTE:
Significant temperature differences occurring when the product is moved from one
location to another can lead to moisture forming on electronic components within the
control unit at the beginning.
● Possible malfunction of the control unit during initial start-up.
► We recommend unpacking the product prior to installation and allowing it to rest
at the installation site for 1 hour without being used. Possible moisture formation
on electronic components inside the control unit will be able to dry off.
WARNING:
Danger of contaminated drinking water if the work is not carried out properly
● Risk of infectious diseases.
► Pay attention to hygiene when working on the installation.
5.1
Requirements with regard to the installation site
5.1.1
Requirements with regard to the water connection
Comply with the instructions on installation (refer to chapter 2.7).
For critical applications such as boiler feed water, we recommend the installation of an
automatic water analyser (refer to chapter 3.4).
● Drinking water filter upstream of the system
● Drain connection for drainage of the flushing water (refer to chapter 11)
● Floor drain or a corresponding safety device
● Existing lifting system salt water-resistant
● Clean water side of the system made of corrosion-resistant material
or
use
anticorrosive agent
Summary of Contents for Delta-p
Page 1: ...We understand water Softening Water softener Delta p Operation manual ...
Page 57: ...Mounting instructions 57 74 BA_TD3 BM001en_014_Delta p docx ...
Page 58: ...Mounting instructions 58 74 BA_TD3 BM001en_014_Delta p docx ...
Page 59: ...Mounting instructions 59 74 BA_TD3 BM001en_014_Delta p docx ...
Page 60: ...Mounting instructions 60 74 BA_TD3 BM001en_014_Delta p docx ...
Page 62: ...Mounting instructions 62 74 BA_TD3 BM001en_014_Delta p docx ...
Page 72: ......